I applied via LinkedIn and was interviewed before Nov 2022. There were 3 interview rounds.
Handle high-rise building clients by understanding their unique needs and providing tailored solutions.
Establish clear communication channels to address any concerns or issues promptly
Offer regular updates on project progress and milestones to keep the client informed
Provide personalized recommendations based on the client's specific requirements and budget constraints
Ensure timely completion of projects to maintain cl...
Top trending discussions
posted on 15 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
posted on 6 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.
Manager related
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Property Manager
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Help Desk Executive
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Facility Manager
10
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
GMR Group