SILA Group (India) Assistant Manager Technical Interview Questions and Answers

Updated 9 Nov 2023

SILA Group (India) Assistant Manager Technical Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. How to handle high-rise building client
  • Ans. 

    Handle high-rise building clients by understanding their unique needs and providing tailored solutions.

    • Establish clear communication channels to address any concerns or issues promptly

    • Offer regular updates on project progress and milestones to keep the client informed

    • Provide personalized recommendations based on the client's specific requirements and budget constraints

    • Ensure timely completion of projects to maintain cl...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Who to handle your AMC partner

Interview questions from similar companies

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Regarding Technical questions interviewer asked me, like how to construct flexible pavement road ?
  • Q2. GSB CBR?
  • Q3. For One Lakh cum of soil dumping and compaction how many days require to finish ? and what is requirement of machinery unit?
  • Ans. 

    The duration and machinery requirement for dumping and compacting one lakh cum of soil.

    • The duration depends on the capacity of the machinery and the number of machines used.

    • The type of soil and the site conditions also affect the duration.

    • On average, it takes around 30-45 days to complete the task.

    • The machinery required includes excavators, bulldozers, dump trucks, and compactors.

  • Answered by AI
  • Q4.  Why we need to do C&G?
  • Q5. What is different between Minor bridge and Major bridge?
  • Ans. 

    Minor bridges are usually shorter and have a lower weight capacity than major bridges.

    • Major bridges are typically longer and have a higher weight capacity than minor bridges.

    • Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.

    • Major bridges may require more maintenance and have a higher construction cost than minor bridges.

    • Examples of major bridges i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, Be bold and talk free. Don't fear about what you don't know, explain what are you well known and believe your knowledge and keep going and learning.

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related questions my job
Round 3 - Aptitude Test 
Round 4 - Assignment 

Manager related

Interview Preparation Tips

Interview preparation tips for other job seekers - very good experience in Adani till today

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

SILA Group (India) Interview FAQs

How many rounds are there in SILA Group (India) Assistant Manager Technical interview?
SILA Group (India) interview process usually has 3 rounds. The most common rounds in the SILA Group (India) interview process are Resume Shortlist, One-on-one Round and Technical.

Tell us how to improve this page.

SILA Group (India) Assistant Manager Technical Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 740 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
Adani Group Interview Questions
3.9
 • 186 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
MagicPin Interview Questions
3.0
 • 50 Interviews
Park Plus Interview Questions
2.9
 • 35 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all

SILA Group (India) Assistant Manager Technical Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

3.0

Work-life balance

4.0

Salary

3.0

Job security

3.0

Company culture

4.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Facility Manager
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Property Manager
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Help Desk Executive
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Facility Manager
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare SILA Group (India) with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview