A weigh feeder signal control diagram is a schematic representation of the control system for a weigh feeder.
The diagram typically includes components such as sensors, transmitters, controllers, and actuators.
It shows how the signals from the sensors are processed by the controller to adjust the flow of material in the weigh feeder.
The control diagram may also include feedback loops to ensure accurate and consistent fe...
A control circuit diagram for a Direct-On-Line (DOL) starter with PLC involves connecting the PLC to control the operation of the DOL starter.
The PLC is used to control the start and stop functions of the DOL starter.
Input signals from sensors or switches are sent to the PLC for processing.
The PLC then sends signals to the DOL starter to start or stop the motor.
The control circuit diagram will show the connections betw
The rating of the Main incomer ACB in the previous plant is typically determined based on the total load requirements of the plant.
Main incomer ACB rating is usually determined based on the total load of the plant
It is important to consider factors like peak load, future expansions, and safety margins when selecting the rating
For example, if the total load of the previous plant was 5000kW, the Main incomer ACB rating m
posted on 5 Sep 2024
posted on 19 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
Substation design involves the planning and layout of electrical equipment and systems for power distribution.
Consideration of load requirements and voltage levels
Selection of appropriate equipment such as transformers and circuit breakers
Design of grounding and lightning protection systems
Integration of communication and control systems
Adherence to safety standards and regulations
Examples: Gas Insulated Substations (G...
Various software tools are used for electrical design engineering.
CAD software like AutoCAD, SolidWorks, and CATIA for creating 2D and 3D models
Simulation software like MATLAB, PSCAD, and ETAP for analyzing and testing designs
Programming software like LabVIEW and C++ for developing control systems
Project management software like MS Project for scheduling and tracking progress
I applied via Other and was interviewed in Oct 2018. There were 5 interview rounds.
I am seeking new challenges and growth opportunities in my career.
Seeking new challenges and growth opportunities
Looking for a change to broaden my skillset
Interested in working with a new team and learning from their expertise
The fuse rating for a 22 kW motor depends on the starting current and the type of motor.
The starting current of the motor should be considered when selecting the fuse rating.
The type of motor (e.g. induction, synchronous) also affects the fuse rating.
Consult the motor manufacturer's specifications or a qualified electrician for the appropriate fuse rating.
A general rule of thumb is to use a fuse rating of 125% of the m
Star delta starter is used to reduce starting current and torque in induction motors.
Reduces starting current and torque in induction motors
Protects motor windings from damage
Increases motor lifespan
Used for high power motors
Commonly used in industries such as oil and gas, mining, and manufacturing
The unit of vibration is Hertz (Hz).
Vibration is a measure of the frequency of oscillation of a mechanical or electrical system.
Hertz is the unit of frequency, defined as one cycle per second.
Vibration can be measured using instruments such as accelerometers and vibrometers.
Vibration is an important consideration in the design and maintenance of electrical systems.
Examples of electrical systems that may experience vibr...
I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Oct 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jul 2022. There was 1 interview round.
Some of the top questions asked at the Shyam Steel Manufacturing Electrical Project Engineer interview for experienced candidates -
based on 1 interview
Interview experience
Area Sales Manager
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Sales Officer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
13
salaries
| ₹0 L/yr - ₹0 L/yr |
OPPO
LG Electronics
Cummins
Berger Paints