I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
IS code for slump test is IS 1199-1959.
IS code for slump test is IS 1199-1959.
It is a standard test to determine the workability of concrete.
The test involves filling a slump cone with concrete, then removing the cone and measuring the amount of slump.
The results of the test help in ensuring the quality of concrete mix.
The test is conducted as per the guidelines provided in IS 1199-1959.
IS code for cube test is IS 516:1959
IS code for cube test is IS 516:1959
It specifies the procedure for making and curing concrete test specimens
It also covers the testing of cubes for compressive strength
posted on 11 Nov 2021
I applied via Referral and was interviewed before Nov 2020. There were 4 interview rounds.
Dependency injection is a design pattern where the dependencies of an object are provided externally.
Dependencies are objects that a class needs to function properly
Dependency injection allows for loose coupling between objects
There are three types of dependency injection: constructor injection, setter injection, and interface injection
Example: Instead of creating a new instance of a dependency within a class, the depe...
Steam API is a set of tools and resources for game developers to integrate Steam features into their games.
Steam API provides access to features such as matchmaking, achievements, and user profiles.
Developers can use Steamworks SDK to integrate Steam features into their games.
Steam API also allows for in-game purchases and microtransactions.
Examples of games that use Steam API include Counter-Strike: Global Offensive a
HashMap is a data structure that stores key-value pairs and uses hashing to retrieve values quickly.
Hashing function is used to convert the key into an index of an array where the value is stored.
Collisions occur when two keys have the same hash value, which is resolved using separate chaining or open addressing.
HashMap uses an array of linked lists to handle collisions.
The load factor determines when the HashMap shoul...
posted on 16 Dec 2021
I applied via Walk-in and was interviewed before Dec 2020. There were 4 interview rounds.
TPM stands for Total Productive Maintenance, a system that aims to maximize equipment effectiveness and minimize downtime.
TPM involves regular maintenance and inspection of equipment to prevent breakdowns
It also includes training employees to operate and maintain equipment properly
TPM aims to create a culture of continuous improvement and teamwork
Examples of TPM tools include visual management, autonomous maintenance, ...
MTTR stands for Mean Time To Repair. It is the average time taken to repair a system or equipment after a failure.
MTTR is a key metric used in maintenance management.
It helps in measuring the efficiency of maintenance processes.
MTTR can be calculated by dividing the total downtime by the number of repairs.
For example, if a machine was down for a total of 10 hours and it took 2 repairs to fix it, the MTTR would be 5 hou...
posted on 26 May 2021
I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 4 Mar 2022
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
posted on 21 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
posted on 12 Nov 2020
I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.
MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.
MPLS stands for Multiprotocol Label Switching
Labels are assigned to packets at the ingress router
Labels are used to identify the path a packet should take through the network
Labels are swapped at each MPLS router along the path
The last MPLS router removes the label and forwards the packet based on the IP ad...
Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.
Route reflector reduces the number of iBGP peerings required in a network.
It helps in scaling the network by reducing the number of updates and processing required.
Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.
It is commonly used in ...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
based on 1 interview
Interview experience
based on 40 reviews
Rating in categories
Civil Site Engineer
19
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Project Manager
7
salaries
| ₹3 L/yr - ₹10 L/yr |
Accountant
6
salaries
| ₹1 L/yr - ₹2.2 L/yr |
Site Engineer
6
salaries
| ₹2.7 L/yr - ₹3.2 L/yr |
Executive Accountant
5
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Larsen & Toubro Limited
Tata Projects
Punj Lloyd
Simplex Infrastructures