Segula Technologies
Goel Construction Interview Questions and Answers
Q1. What tasks did you perform during the calibration process?
During the calibration process, I performed tasks such as adjusting settings, testing equipment accuracy, and documenting results.
Adjusting settings on the equipment to ensure accuracy
Testing equipment accuracy using known standards
Documenting calibration results for future reference
Q2. 8D method explanation
The 8D method is a problem-solving approach used to identify, correct, and prevent recurring problems.
8D stands for 8 disciplines, each representing a step in the problem-solving process
Steps include defining the problem, forming a team, identifying root causes, implementing corrective actions, and preventing recurrence
Example: A manufacturing company uses the 8D method to address a quality issue in their production line
Q3. Tell about biw different manufacturing processes ?
BIW (Body in White) manufacturing processes include stamping, welding, and assembly.
Stamping: involves shaping metal sheets using a press machine to create body panels and structural components.
Welding: joins stamped parts together using various techniques like spot welding, MIG welding, and laser welding.
Assembly: involves putting together stamped and welded components to form the final body structure of the vehicle.
Q4. strength of material , production and manufacturing
Strength of material, production, and manufacturing are key aspects of engineering that involve understanding the properties of materials and processes involved in creating products.
Strength of materials involves analyzing the behavior of materials under different types of loads and stresses.
Production focuses on the process of creating goods or services, including planning, designing, and optimizing production processes.
Manufacturing involves the actual production of goods t...read more
Q5. How is wire selected?
Wire is selected based on the application requirements such as current carrying capacity, voltage rating, temperature range, and environmental factors.
Consider the current carrying capacity required for the application
Determine the voltage rating needed for the wire
Take into account the temperature range the wire will be exposed to
Consider any environmental factors such as moisture or chemicals
Choose the appropriate wire gauge based on the above factors
Examples: automotive wi...read more
Q6. Equipment for assembly cars
Equipment for assembly cars includes tools, machinery, and robotics used in the manufacturing process.
Tools such as wrenches, screwdrivers, and pliers are essential for assembling car parts.
Machinery like conveyor belts, hydraulic presses, and welding machines are used in the production line.
Robotics such as robotic arms and automated guided vehicles help in the assembly process.
Examples: torque wrench, assembly line conveyor, robotic welding arm
Top HR Questions asked in Goel Construction
Interview Process at Goel Construction
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month