Q1. Wht is w/c ratio for moderate condition for Concrete mix
The w/c ratio for moderate condition for concrete mix is typically between 0.45 to 0.55.
The w/c ratio determines the strength and workability of the concrete mix.
Moderate conditions refer to average temperature and humidity levels.
A w/c ratio of 0.45 to 0.55 is suitable for most construction projects.
Higher w/c ratios can result in weaker and more porous concrete.
Lower w/c ratios can make the mix difficult to work with and may lead to cracking.
Q2. what is limits of AIV sand zone
AIV sand zone limits refer to the maximum allowable acoustic impedance variation in sand formations.
AIV sand zone limits are determined based on the type of sand formation and the surrounding rock formations.
The limits are set to prevent damage to wellbore equipment and ensure safe drilling operations.
For example, in some formations, the AIV limit may be set at 20% while in others it may be as low as 5%.
AIV limits can also vary depending on the depth of the well and the press...read more
Q3. What kind of buitmens?what density sand ?
The type of building materials required for construction and the density of sand depend on the specific project and its requirements.
The type of building materials needed for construction can vary based on factors such as the type of structure, location, and purpose.
Common building materials include bricks, cement, steel, wood, and concrete.
The density of sand can vary depending on its composition and moisture content.
For example, fine sand used for plastering may have a lowe...read more
Q4. What was difference between super structere and sub structure
Q5. What is earthwork
Earthwork refers to the process of moving, excavating, and compacting soil and rock to prepare the ground for construction.
Earthwork involves activities such as excavation, grading, compaction, and backfilling.
It is essential for creating a stable foundation for roads, buildings, and other structures.
Earthwork also includes the removal of unwanted materials and the addition of necessary materials to achieve the desired elevation and slope.
Examples of earthwork include digging...read more
Q6. What is GSB wmm
GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam. GSB WMM is a type of road construction method using layers of granular materials.
GSB is the layer of granular material placed on the subgrade of a road to provide a stable foundation.
WMM is a mixture of aggregates, filler, and water laid on the GSB layer to form a strong base for the road.
GSB WMM construction involves compacting each layer properly to ensure durability and strength of the road.
Example: GSB l...read more
Top HR Questions asked in Mind Ruby Technologies
Interview Process at Mind Ruby Technologies
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month