Highway Civil Engineer
Highway Civil Engineer Interview Questions and Answers
Q1. How many vibro roller passes are necessary for full compaction as per IRC
IRC recommends 8-10 passes of vibro roller for full compaction.
IRC (Indian Road Congress) recommends 8-10 passes of vibro roller for full compaction.
The number of passes may vary depending on factors such as soil type, moisture content, and thickness of the layer.
In some cases, additional passes may be required to achieve the desired level of compaction.
It is important to conduct regular tests to ensure that the desired level of compaction has been achieved.
Proper compaction ...read more
Q2. Method and formula to determine quantity of soil in emb or subgrade
The quantity of soil in embankment or subgrade can be determined using the method of average end area.
The method of average end area involves taking cross-sectional measurements at regular intervals along the embankment or subgrade.
The cross-sectional measurements are used to calculate the area of each section.
The average area is then multiplied by the length of the embankment or subgrade to determine the volume of soil.
The formula for calculating the volume is: Volume = Aver...read more
Q3. What is standard mdd of subgrade soil
The standard MDD (Maximum Dry Density) of subgrade soil varies depending on the specific project requirements and soil characteristics.
The standard MDD of subgrade soil is determined through laboratory tests.
It is influenced by factors such as soil type, compaction method, moisture content, and compaction effort.
Different soil types have different standard MDD values.
For example, the standard MDD of a sandy soil may be different from that of a clayey soil.
The standard MDD is ...read more
Q4. Civil engineering highway engineering experience in 7 year's above
Yes, I have over 7 years of experience in civil engineering with a focus on highway engineering.
Designed and implemented various highway projects, ensuring compliance with safety regulations and standards
Managed construction projects, overseeing budgeting, scheduling, and quality control
Collaborated with government agencies and stakeholders to address transportation needs and improve infrastructure
Utilized software such as AutoCAD and Civil 3D for design and analysis
Performed...read more
Q5. Name the test to detrermine fdd of soil
The test to determine FDD of soil is called the Falling Head Permeability Test.
Falling Head Permeability Test is used to determine the coefficient of permeability of soil.
It involves measuring the time taken for water to flow through a soil sample under a constant head.
The test is conducted using a permeameter, which consists of a cylindrical tube with a soil sample and a falling head of water.
The coefficient of permeability is calculated using Darcy's Law.
The test is useful ...read more
Q6. What is tcs?
TCS stands for Tata Consultancy Services.
TCS is an Indian multinational IT services and consulting company.
It is one of the largest IT service providers in the world.
TCS offers a wide range of services including software development, infrastructure management, and consulting.
The company has a strong presence in the highway engineering sector, providing technology solutions for transportation and infrastructure projects.
TCS has worked on various highway projects, such as imple...read more
Share interview questions and help millions of jobseekers 🌟
Q7. 6 passes of vibro roller 1P, 1MV, 1V, 2P
The question is asking about the number of passes of different types of vibro rollers for highway construction.
6 passes of vibro roller 1P
6 passes of vibro roller 1MV
6 passes of vibro roller 1V
6 passes of vibro roller 2P
Q8. What is earthwork
Earthwork refers to the process of moving, excavating, and compacting soil and rock to prepare the ground for construction.
Earthwork involves activities such as excavation, grading, compaction, and backfilling.
It is essential for creating a stable foundation for roads, buildings, and other structures.
Earthwork also includes the removal of unwanted materials and the addition of necessary materials to achieve the desired elevation and slope.
Examples of earthwork include digging...read more
Q9. What is GSB wmm
GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam. GSB WMM is a type of road construction method using layers of granular materials.
GSB is the layer of granular material placed on the subgrade of a road to provide a stable foundation.
WMM is a mixture of aggregates, filler, and water laid on the GSB layer to form a strong base for the road.
GSB WMM construction involves compacting each layer properly to ensure durability and strength of the road.
Example: GSB l...read more
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month