Filter interviews by
I applied via Job Portal and was interviewed in Apr 2021. There were 3 interview rounds.
Technically and mathematics and our I q test
Measurements for project drawings and quantities can be determined through detailed analysis and calculations.
Measurements can be taken directly from the project drawings using scales and measuring tools.
Quantities can be calculated based on the dimensions provided in the drawings.
Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.
Bill of Quantities (BOQ) can be prepa...
posted on 13 Nov 2020
posted on 27 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
based on 1 review
Rating in categories
Sales Manager
7
salaries
| ₹5 L/yr - ₹6 L/yr |
Assistant Manager
6
salaries
| ₹3.9 L/yr - ₹5 L/yr |
Civil Site Engineer
4
salaries
| ₹2.2 L/yr - ₹3.2 L/yr |
General Manager Sales
4
salaries
| ₹12 L/yr - ₹15 L/yr |
Sales Executive
4
salaries
| ₹3 L/yr - ₹5 L/yr |
Omaxe
Runwal Group
Mahindra Lifespace Developers
Realty Assistant