I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.
MPR stands for Monthly Progress Report and WPR stands for Weekly Progress Report.
MPR is a report that summarizes the progress made on a project over the course of a month.
WPR is a report that summarizes the progress made on a project over the course of a week.
Both reports typically include key accomplishments, challenges faced, and next steps.
MPRs are usually more detailed and comprehensive compared to WPRs.
MPRs are of...
WPR stands for Work Package Report, which includes updates on project progress, issues, risks, and next steps.
WPR includes updates on project progress, such as completed tasks and milestones achieved
It also covers any issues or challenges encountered during the project
Risks identified and mitigation strategies are outlined in the WPR
Next steps and action items for the project team are included in the report
I will manage a project by creating a detailed plan, assigning tasks, monitoring progress, and adjusting as needed.
Create a detailed project plan outlining goals, timelines, and resources
Assign tasks to team members based on their strengths and expertise
Monitor progress regularly to ensure deadlines are met
Communicate effectively with team members and stakeholders
Adjust the plan as needed based on feedback and changes
My expected CTC is in line with industry standards and based on my experience and skills.
My expected CTC is competitive and reflective of my qualifications
I have researched the market rates for Project Coordinators in this region
I am open to negotiation based on the overall compensation package offered
Top trending discussions
I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.
Some tools and softwares in the field of project coordination include Microsoft Project, Asana, Trello, and Jira.
Microsoft Project
Asana
Trello
Jira
I am currently earning a competitive salary based on my experience and qualifications.
My current salary is in line with industry standards.
I am open to discussing salary expectations for this new role.
I believe my compensation should reflect my skills and contributions.
I am looking for a fair and competitive salary package.
I am confident in my value and am seeking a salary that reflects that.
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2020. There were 5 interview rounds.
I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.
Yes, I am able to do SLD.
SLD stands for Single Line Diagram, which is a graphical representation of an electrical system.
I have experience in creating and interpreting SLDs.
I am familiar with the symbols and conventions used in SLDs.
I can use software tools such as AutoCAD and Visio to create SLDs.
I understand the importance of accuracy and clarity in SLDs for effective communication and troubleshooting.
Yes, I am able to do earthing and cable scheduling.
I have experience in designing and implementing earthing systems for various projects.
I am proficient in creating cable schedules using software such as AutoCAD and Microsoft Excel.
I am familiar with industry standards and regulations related to earthing and cable scheduling.
For example, in my previous role as a Project Coordinator for a construction company, I was res...
posted on 8 Nov 2022
Construction joints are not typically provided for staircases.
Construction joints are typically used in concrete structures to allow for expansion and contraction due to temperature changes.
Staircases are usually designed as a single unit and do not require construction joints.
However, if the staircase is very long or has multiple flights, construction joints may be necessary to allow for movement.
In this case, the joi...
Deflection in PT slab can be arrested by increasing the thickness of slab, using high strength concrete, and providing additional reinforcement.
Increase the thickness of the slab to reduce deflection
Use high strength concrete to increase the load carrying capacity of the slab
Provide additional reinforcement such as steel bars or post-tensioning tendons to increase the stiffness of the slab
Ensure proper curing of the co...
Modern waterproofing techniques include liquid applied membranes, preformed membranes, and crystalline waterproofing.
Liquid applied membranes: applied as a liquid and cures to form a seamless, waterproof membrane. Examples include polyurethane and acrylic coatings.
Preformed membranes: sheets of waterproof material that are applied to the surface. Examples include EPDM and PVC membranes.
Crystalline waterproofing: a chem...
Various waterproofing applications are used on terrace roof slabs of commercial and residential buildings.
Liquid waterproofing membranes
Bituminous waterproofing membranes
Polyurethane waterproofing membranes
Cementitious waterproofing coatings
Sheet waterproofing membranes
Examples: Dr. Fixit Newcoat, Fosroc Proofex, SikaTop Seal 107
The floor to floor height of commercial buildings varies depending on the building's purpose and design.
The floor to floor height of a typical office building is around 3.9 meters.
Warehouses and industrial buildings have higher floor to floor heights, usually around 4.5 to 6 meters.
Residential buildings have lower floor to floor heights, usually around 2.7 to 3 meters.
The floor to floor height can also be affected by t...
posted on 15 May 2023
I applied via LinkedIn and was interviewed in Nov 2022. There were 3 interview rounds.
posted on 26 Apr 2024
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Project scheduling involves creating a timeline for project tasks, while costing involves estimating the expenses associated with each task.
Project scheduling involves breaking down the project into tasks, determining the sequence of tasks, and assigning timeframes to each task.
Costing involves estimating the resources required for each task, including labor, materials, and equipment costs.
Project scheduling and costin...
based on 1 interview
Interview experience
Assistant Manager
135
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant General Manager
24
salaries
| ₹0 L/yr - ₹0 L/yr |
CBRE
JLL
Colliers India
Knight Frank