Filter interviews by
I applied via Newspaper Ad and was interviewed in May 2024. There were 2 interview rounds.
Shop drawings of Architecture are detailed drawings created by draftsmen to show how a building will be constructed.
Shop drawings are detailed and specific to the construction process
They include dimensions, materials, and installation instructions
Draftsmen work closely with architects and engineers to create accurate shop drawings
Examples include detailed drawings of structural components like steel beams or curtain w
Top trending discussions
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
The Soil Bearing Capacity of Adyar varies depending on the specific location and soil composition.
Soil bearing capacity is typically measured in terms of pressure per unit area that the soil can support without failure.
Factors affecting soil bearing capacity include soil type, moisture content, compaction, and depth.
For Adyar, the soil bearing capacity can range from 1000 to 5000 kN/m^2 depending on the specific locati
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
posted on 25 Jan 2025
Role of engineer to control disaster management
I applied via Referral and was interviewed before Apr 2023. There were 4 interview rounds.
CAD test on UGNX for mounting concept.
I applied via Referral and was interviewed in Mar 2021. There was 1 interview round.
JHA stands for Job Hazard Analysis. It is a process of identifying potential hazards in a job or task and implementing measures to control or eliminate them.
JHA is a systematic approach to identify and evaluate potential hazards in a job or task.
It involves breaking down a job into steps and analyzing each step for potential hazards.
The goal of JHA is to identify hazards and implement measures to control or eliminate t...
WMS stands for Warehouse Management System.
WMS is a software application that helps manage warehouse operations.
It includes inventory management, order fulfillment, and shipping.
WMS can improve efficiency, accuracy, and productivity in a warehouse.
Examples of WMS include SAP EWM, Oracle WMS, and Manhattan Associates WMoS.
PTW stands for Permit to Work. It is a formal written system used to control high-risk activities.
PTW is a safety management system used to ensure that high-risk activities are carried out safely.
It involves obtaining a written permit before starting any high-risk activity.
The permit outlines the hazards associated with the activity and the precautions that need to be taken.
PTW is commonly used in industries such as co...
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
Safety is the state of being protected from harm, danger, or injury.
Safety involves identifying and assessing potential hazards
Implementing measures to control or eliminate those hazards
Providing training and education to prevent accidents
Maintaining equipment and facilities to ensure they are safe to use
Encouraging a culture of safety in the workplace
Examples include wearing personal protective equipment, following sa...
Safety officer duties include ensuring compliance with safety regulations, identifying and mitigating hazards, and promoting a culture of safety.
Develop and implement safety policies and procedures
Conduct safety inspections and audits
Investigate accidents and incidents
Provide safety training to employees
Maintain safety records and reports
Collaborate with management and employees to promote safety culture
Fall arresting system in high rise story can be provided through various means.
Use of safety nets
Installation of guardrails
Use of personal fall arrest systems
Proper training and education of workers
Regular inspection and maintenance of equipment
posted on 29 Aug 2022
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.
H2s, confined space hazard and precaution, what's different b/w pre commissioning & commissioning, PSV, SWL, STEL, What's is ur pervious experience eg. Flare erection, tank erection, pre commissioning & commissioning, 11kv crude substation.
posted on 3 Dec 2024
I applied via Walk-in and was interviewed before Dec 2023. There were 2 interview rounds.
Objective types questions
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Electrical Engineer
16
salaries
| ₹1.8 L/yr - ₹12.1 L/yr |
Safety Officer
15
salaries
| ₹5.2 L/yr - ₹13.6 L/yr |
Salesforce Developer
13
salaries
| ₹31.6 L/yr - ₹40 L/yr |
Document Controller
12
salaries
| ₹0.8 L/yr - ₹9 L/yr |
Electrician
11
salaries
| ₹2.6 L/yr - ₹8 L/yr |
Nasser S. Al Hajri Corporation
Leighton Contractors
Eversendai
Descon Engineering