Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
PM stands for Preventive Maintenance and CM stands for Corrective Maintenance in the field of instrumentation.
PM involves scheduled inspections, repairs, and replacements to prevent equipment failure.
CM involves fixing equipment after it has already failed to restore it to working condition.
PM is proactive maintenance while CM is reactive maintenance.
Example: Changing filters regularly (PM) vs. replacing a broken senso
Calibration is the process of adjusting or checking the accuracy of a measuring instrument by comparing it to a known standard.
Calibration ensures that the instrument provides accurate and reliable measurements.
It involves adjusting the instrument to match the standard or known value.
Calibration is important for maintaining quality control and ensuring consistency in measurements.
Examples of calibrated instruments incl
based on 1 review
Rating in categories
Mechanical Engineer
4
salaries
| ₹8.5 L/yr - ₹25.1 L/yr |
Maintenance Planner
4
salaries
| ₹15 L/yr - ₹42 L/yr |
Mechanical Foreman
4
salaries
| ₹12 L/yr - ₹14 L/yr |
Mechanical Technician
4
salaries
| ₹10.5 L/yr - ₹12 L/yr |
Document Controller
3
salaries
| ₹10.5 L/yr - ₹17.4 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA