Filter interviews by
The iron-carbon diagram explains the types of steel based on carbon content.
The diagram shows the relationship between carbon content and steel properties.
Low carbon steel (up to 0.3%) is ductile and easily formed.
Medium carbon steel (0.3-0.6%) is stronger and harder, used for gears and axles.
High carbon steel (above 0.6%) is very hard and brittle, used for cutting tools.
Alloy steel contains other elements besides carb...
The case hardening cycle for 16Mncr5 gears with a case depth of 0.5-0.8 mm involves several steps.
Preheat the gears to 850-900°C
Carburize the gears at 930-960°C for 4-6 hours
Quench the gears in oil or water at 150-200°C
Temper the gears at 150-200°C for 2-4 hours
Check the case depth using a microhardness tester
Adjust the cycle as necessary to achieve the desired case depth
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2018. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Dec 2018. There were 3 interview rounds.
PPAP submission is the final phase of APQP.
PPAP submission is the final step in the APQP process.
It involves submitting a Production Part Approval Process (PPAP) to the customer.
PPAP includes documentation and samples that demonstrate the product meets customer requirements.
PPAP submission is necessary before production can begin.
PPAP submission is a critical step in ensuring product quality and customer satisfaction.
APQP consists of five phases, with PPAP being submitted in the fourth phase.
APQP stands for Advanced Product Quality Planning.
The five phases of APQP are: Planning and Program Definition, Product Design and Development, Process Design and Development, Product and Process Validation, and Launch, Feedback, Assessment, and Corrective Action.
PPAP stands for Production Part Approval Process.
PPAP is submitted in the fourth p...
To make a PPT, use a software like PowerPoint or Google Slides and follow a structure with clear and concise content.
Choose a template or create your own design
Add relevant and visually appealing images
Use bullet points and short sentences
Practice your presentation before presenting
Include a conclusion and call to action
Process audit involves reviewing and evaluating a company's procedures and policies to ensure they are effective and efficient.
Identify the process to be audited
Define the audit objectives and scope
Select the audit team and assign roles
Gather and analyze data
Identify areas for improvement
Develop and implement corrective actions
Monitor and follow up on corrective actions
Document the audit findings and recommendations
When a customer complaint arises, I listen attentively, empathize with their concerns, investigate the issue, propose a solution, and follow up to ensure satisfaction.
Listen attentively to the customer's complaint
Empathize with their concerns and show understanding
Investigate the issue by gathering relevant information
Propose a solution or offer alternatives to address the complaint
Follow up with the customer to ensure
Can you please clarify the question?
I'm sorry, I don't understand what you're asking.
Could you please rephrase the question?
I need more information to answer that question.
Gauges and fixtures should be developed during the design phase of NPD to ensure quality and efficiency.
Identify critical dimensions and tolerances early on
Develop gauges and fixtures to measure and verify these dimensions
Test and refine gauges and fixtures throughout the design process
Ensure gauges and fixtures are compatible with manufacturing processes
Finalize gauges and fixtures before production begins
I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.
PPAP stands for Production Part Approval Process.
PPAP is a standardized process used in the automotive industry to ensure that suppliers meet the requirements for production parts.
It involves a series of documentation and approval steps to demonstrate that the supplier's manufacturing process is capable of consistently producing parts that meet the customer's specifications.
PPAP includes elements such as design records...
5S is a workplace organization method that aims to improve efficiency and productivity by eliminating waste and optimizing processes.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order involves organizing the remaining items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize involves c...
Calibration instrument is a process of removing errors between instruments and providing NABL certificate.
Calibration is the process of adjusting an instrument to provide accurate results.
It involves comparing the readings of the instrument with a known standard.
The errors are then removed by adjusting the instrument accordingly.
NABL (National Accreditation Board for Testing and Calibration Laboratories) certificate is...
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 4 interview rounds.
My previous job KPI was to increase sales revenue by 20% within a year.
My KPI was to increase sales revenue by 20% within a year
I achieved this by implementing targeted marketing campaigns
I also optimized the sales process to improve efficiency
Regularly analyzed sales data to identify areas for improvement
Interview with Plant Chairman
Excel
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 2 interview rounds.
Red box is a tool used in quality control to visually display data and identify outliers. 7QC tools are a set of techniques used for quality improvement.
Red box is a visual tool used in quality control to highlight outliers in data
7QC tools refer to a set of techniques used for quality improvement, including Pareto charts, histograms, and scatter diagrams
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
Personal information & Essay writing etc. some technical questions.
Specialist
28
salaries
| ₹0.9 L/yr - ₹7 L/yr |
Production Engineer
27
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Quality Engineer
23
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Team Lead
20
salaries
| ₹4.7 L/yr - ₹9.5 L/yr |
Senior Engineer
15
salaries
| ₹3.7 L/yr - ₹5.8 L/yr |
Ag Industries
Toyoda Gosei Minda
Ralson Tyres Limited
Global Autotech