Filter interviews by
I applied via Approached by Company and was interviewed before Dec 2021. There were 4 interview rounds.
Top trending discussions
posted on 16 Feb 2024
Concrete temperature refers to the temperature of freshly mixed concrete before it sets.
Concrete temperature affects the setting time and strength development of concrete.
It is important to monitor and control the temperature of concrete during mixing, transportation, and placement.
The ideal temperature range for concrete is typically between 50-75 degrees Fahrenheit.
Extreme temperatures can lead to issues such as ther...
About your position.
I applied via Referral and was interviewed in Aug 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2021. There were 2 interview rounds.
posted on 23 Jul 2021
The future of QA/QC department is bright with increasing demand for quality products and services.
Adoption of new technologies like AI and automation
Increased focus on data analysis and continuous improvement
Integration of QA/QC into overall business strategy
Growing importance of regulatory compliance
Need for skilled and certified QA/QC professionals
posted on 21 Dec 2023
I applied via LinkedIn and was interviewed in Nov 2023. There were 2 interview rounds.
The procedure for material selection, calculations, and real-time experience in projects involves thorough research, analysis, and testing.
Research different materials based on project requirements and constraints
Perform calculations to determine material properties, dimensions, and feasibility
Conduct tests and simulations to validate material selection and design choices
Gain real-time experience through hands-on proje...
posted on 3 May 2023
posted on 18 Feb 2023
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Residual Camber is the amount of curvature that remains in a structural member after it has been manufactured or formed.
Residual Camber is a common term used in the field of structural engineering.
It refers to the amount of curvature that remains in a structural member after it has been manufactured or formed.
It is typically measured as the difference between the actual curvature and the desired or intended curvature o...
To maintain positive camber, adjust the suspension components and alignment angles.
Check and adjust the camber angle using a camber gauge
Inspect and replace worn or damaged suspension components
Adjust the suspension height or preload
Ensure proper alignment of the wheels
Use shims or adjustable control arms to fine-tune the camber angle
Yes, I am familiar with torquing on HSFG bolts.
Torquing refers to the process of tightening bolts to a specific torque value.
HSFG stands for High Strength Friction Grip, which is a type of bolt used in structural applications.
Torquing on HSFG bolts is important to ensure proper clamping force and prevent loosening.
The torque value for HSFG bolts is typically specified by the manufacturer or engineering standards.
Using ...
Matching hole fairness involves ensuring that the dimensions and alignment of holes in mechanical components meet specified standards.
Use precision measuring tools like calipers and micrometers to measure hole dimensions
Check hole alignment using alignment pins or laser alignment tools
Compare measured dimensions and alignment with specified tolerances
Use visual inspection to check for burrs, rough edges, or other surfa...
Launching a girder at height involves careful planning and execution.
Ensure proper lifting equipment and rigging are used
Conduct a thorough risk assessment and develop a detailed lifting plan
Coordinate with a team of skilled personnel to ensure safe and efficient execution
Use cranes or other lifting devices to hoist the girder to the desired height
Ensure proper alignment and positioning of the girder during the lifting...
A power transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Power transformers are used to step up or step down voltage levels in electrical power transmission and distribution systems.
They consist of a primary winding, a secondary winding, and a magnetic core.
When an alternating current flows through the primary winding, it creates a magne...
based on 1 review
Rating in categories
Senior Quality Engineer
9
salaries
| ₹3 L/yr - ₹4.7 L/yr |
QA QC Engineer
9
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Production Engineer
9
salaries
| ₹1.5 L/yr - ₹2.5 L/yr |
Senior Engineer
7
salaries
| ₹3.2 L/yr - ₹4.8 L/yr |
Quality Engineer
7
salaries
| ₹2.5 L/yr - ₹3 L/yr |
Hindustan Unilever
Procter & Gamble
Nestle
ITC