Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Sakshham Consultants Team. If you also belong to the team, you can get access from here

Sakshham Consultants Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Sakshham Consultants Assistant Project Manager Interview Questions and Answers

Updated 28 May 2023

Sakshham Consultants Assistant Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What are the main pillars of PMC in Construction
  • Ans. 

    The main pillars of PMC in construction are Time, Cost, Quality, and Safety.

    • Time management to ensure timely completion of the project

    • Cost management to ensure the project is completed within the budget

    • Quality management to ensure the project meets the required standards

    • Safety management to ensure the safety of workers and the public

    • Effective communication and coordination between all stakeholders

  • Answered by AI
  • Q2. Which activities are in Construction projects can execute simultaneously?
  • Ans. 

    Several activities in construction projects can be executed simultaneously.

    • Site preparation and foundation work can be done simultaneously

    • Electrical and plumbing work can be done simultaneously

    • Interior finishing work can be done simultaneously with exterior work

    • Landscaping and exterior finishing work can be done simultaneously

    • Concrete pouring and steel erection can be done simultaneously

  • Answered by AI
  • Q3. Example - Electrical Conduitinh and Plumbing Conduitinh Doors and windows
  • Ans. 

    Electrical and plumbing conduit are used to route wires and pipes respectively, while doors and windows provide access and ventilation.

    • Electrical conduit is typically made of metal or plastic and is used to protect and route electrical wires.

    • Plumbing conduit, also known as pipes, are used to transport water, gas, and waste.

    • Doors provide access to a room or building, while windows allow for natural light and ventilation...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Previous job roles
  • Ans. 

    I have held various project management roles in the past, overseeing the successful completion of multiple projects.

    • Managed cross-functional teams to deliver projects on time and within budget

    • Developed project plans, schedules, and budgets

    • Identified and mitigated project risks

    • Communicated project status updates to stakeholders

    • Ensured project deliverables met quality standards

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Installation of interior fitout in a specific space.
  • Ans. 

    The installation of interior fitout in a specific space involves the process of transforming an empty area into a functional and aesthetically pleasing environment.

    • Understanding the client's requirements and design specifications

    • Creating a detailed project plan and timeline

    • Coordinating with architects, designers, contractors, and suppliers

    • Managing the procurement and delivery of materials and equipment

    • Supervising the i...

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Execution in Structure
  • Ans. 

    Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.

    • Understanding the overall goals and objectives of the organization

    • Developing detailed action plans to achieve those goals

    • Assigning tasks and responsibilities to team members

    • Monitoring progress and making adjustments as needed

    • Ensuring that resources are allocated efficiently

    • Communicating effectively w...

  • Answered by AI
  • Q2. High rise buildings

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Mivan knowledge
  • Q2. How many cycling days scheduled to slab casting and details
  • Ans. 

    The number of cycling days scheduled for slab casting varies depending on the project timeline and size of the slabs.

    • Cycling days for slab casting can range from 1 to 5 days per slab, depending on the size and complexity of the slab.

    • Factors such as weather conditions, equipment availability, and workforce efficiency can also impact the number of cycling days.

    • For example, a smaller slab may only require 1-2 cycling days...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for S V S Projects India Deputy Project Manager interview:
  • Planning
  • Material Management
  • Quality checklist
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. General work experience, background checks and flexibility to work on multiple locations
Round 2 - Aptitude Test 

They have a test paper that you have to fill before meeting MD in final round

Round 3 - One-on-one 

(1 Question)

  • Q1. When can you join?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest in your abilities

I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Give a brief introduction about yourself
  • Q2. Explain roles and responsibilities in detail
  • Q3. Explain about software skills.
  • Ans. 

    Software skills refer to the ability to use various software tools and applications effectively.

    • Proficiency in programming languages such as Java, Python, C++

    • Familiarity with software development methodologies such as Agile, Waterfall

    • Experience with software testing and debugging

    • Knowledge of database management systems like MySQL, Oracle

    • Ability to use software tools like Git, JIRA, Visual Studio

    • Understanding of web dev

  • Answered by AI
Round 2 - One-on-one 

(3 Questions)

  • Q1. Technical questions about inter fits outs
  • Q2. Type of projects handled. Explain about the challenges and how you overcame them
  • Q3. Strengths and weakness as project engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interview experience. All my doubts were clarified in professional manner.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. What are the seven quality control tools, and can you provide explanations for each?
  • Ans. 

    The seven quality control tools are essential for process improvement and problem-solving in engineering.

    • Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.

    • Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.

    • Cause-and-effect diagram (Fishbone diagram): Visuali...

  • Answered by AI
  • Q2. 5S and visual management
  • Q3. What are the seven steps of autonomous maintenance?
  • Ans. 

    Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.

    • Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.

    • Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.

    • Step 3: General Inspection - Operators visually inspect the ...

  • Answered by AI
  • Q4. What are the calculations involved in Overall Equipment Effectiveness (OEE)?
  • Ans. 

    OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.

    • Calculate Availability by dividing Operating Time by Planned Production Time.

    • Calculate Performance by dividing Actual Production by Maximum Possible Production.

    • Calculate Quality by dividing Good Units Produced by Total Units Started.

  • Answered by AI
  • Q5. Why is it mandatory for an organization to implement lean practices?
  • Ans. 

    Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.

    • Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.

    • By implementing lean practices, organizations can improve quality control and reduce defects in products or services.

    • Lean practices promote continuous improvement and empower ...

  • Answered by AI
  • Q6. How can downstream team members be motivated?
  • Ans. 

    Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.

    • Provide recognition for their hard work and achievements

    • Communicate clearly about goals, expectations, and feedback

    • Offer opportunities for growth and development, such as training or mentorship programs

    • Create a positive work environment through team-building activities a

  • Answered by AI
  • Q7. What is Pareto analysis and how is it applied in decision-making processes?
  • Ans. 

    Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.

    • Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.

    • It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.

    • By focusing on addressing the most critical fact...

  • Answered by AI
  • Q8. What is a Gemba walk, and how is it performed?
  • Ans. 

    A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.

    • Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.

    • Managers should focus on understanding the work being done and the challenges faced by employees.

    • Gemba walks help in building relationships with employees and fostering a culture of c...

  • Answered by AI
  • Q9. What are the steps involved in performing safety risk assessments?
  • Ans. 

    Steps involved in performing safety risk assessments

    • Identify hazards and potential risks

    • Assess the likelihood and severity of each risk

    • Implement control measures to mitigate risks

    • Monitor and review the effectiveness of control measures

    • Document findings and recommendations

    • Communicate risks to relevant stakeholders

  • Answered by AI
  • Q10. Explain about TPM
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.

    • It involves autonomous maintenance, planned maintenance, and focused improvement activities.

    • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced business analyst with a background in data analysis and process improvement.

    • Over 5 years of experience in analyzing business processes and identifying areas for improvement

    • Skilled in data analysis tools such as Excel, SQL, and Tableau

    • Strong communication and problem-solving skills

    • Led a project to streamline inventory management processes, resulting in a 20% reduction in costs

  • Answered by AI
  • Q2. Tell me about your roles and responsibilities

Sakshham Consultants Interview FAQs

How many rounds are there in Sakshham Consultants Assistant Project Manager interview?
Sakshham Consultants interview process usually has 2 rounds. The most common rounds in the Sakshham Consultants interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Sakshham Consultants Assistant Project Manager interview?

Some of the top questions asked at the Sakshham Consultants Assistant Project Manager interview -

  1. Which activities are in Construction projects can execute simultaneous...read more
  2. What are the main pillars of PMC in Construct...read more
  3. Example - Electrical Conduitinh and Plumbing Conduitinh Doors and wind...read more

Tell us how to improve this page.

Sakshham Consultants Assistant Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Sakshham Consultants Assistant Project Manager Salary
based on 4 salaries
₹4.1 L/yr - ₹5.5 L/yr
50% less than the average Assistant Project Manager Salary in India
View more details

Sakshham Consultants Assistant Project Manager Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

4.5

Salary

4.5

Job security

3.6

Company culture

4.2

Promotions

4.4

Work satisfaction

Explore 2 Reviews and Ratings
Project Manager
10 salaries
unlock blur

₹6.2 L/yr - ₹9.4 L/yr

Project Engineer
8 salaries
unlock blur

₹3.6 L/yr - ₹7 L/yr

Assistant Project Manager
4 salaries
unlock blur

₹4.1 L/yr - ₹5.4 L/yr

Planning Engineer
3 salaries
unlock blur

₹3.6 L/yr - ₹4.6 L/yr

Project Manager Civil
3 salaries
unlock blur

₹6.5 L/yr - ₹10 L/yr

Explore more salaries
Compare Sakshham Consultants with

GAMMON INDIA

3.8
Compare

Patil Group

3.9
Compare

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview