1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(5 Questions)

  • Q1. Process optimization and operation related like heat , mass, air balance, powe consumption, plants improvements
  • Q2. How much heat consumption in your units and which types of fuels used and what is impacted in quality and production safety related questions
  • Ans. 

    Our units consume approximately 5000 BTU/hr of heat, primarily using natural gas and electricity. Quality and production safety are impacted by fuel availability and combustion efficiency.

    • Heat consumption in our units is around 5000 BTU/hr

    • Primary fuels used are natural gas and electricity

    • Quality and production safety are impacted by fuel availability and combustion efficiency

  • Answered by AI
  • Q3. Which types of AFR using and how much TSR rate. How much WHRS power genrated how to improve WHRS power.
  • Ans. 

    AFR types include coal, biomass, waste, etc. TSR rate varies. WHRS power generation depends on factors like temperature, pressure, and efficiency.

    • Types of AFR: coal, biomass, waste, etc.

    • TSR rate varies based on the type of AFR used.

    • WHR power generation influenced by temperature, pressure, and efficiency.

    • To improve WHRS power, optimize temperature and pressure conditions, enhance system efficiency.

    • Examples: Using high-q...

  • Answered by AI
  • Q4. Which types of refractory use and performances what is the installation cast of refractory.
  • Ans. 

    Different types of refractories have varying performances and installation costs.

    • Types of refractories include fireclay, high alumina, silica, magnesite, and chrome.

    • Performance factors include resistance to heat, chemical corrosion, and mechanical stress.

    • Installation costs depend on the type of refractory, size of the area, and complexity of the installation process.

  • Answered by AI
  • Q5. What is Environmental impact and aspects What is IMS system.
  • Ans. 

    Environmental impact and aspects refer to the effects a company's activities have on the environment. IMS system stands for Integrated Management System.

    • Environmental impact is the result of an organization's activities on the environment, such as pollution, resource depletion, and habitat destruction.

    • Environmental aspects are the elements of an organization's activities, products, or services that can interact with th...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Production Quality Heat related

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 1.About verious cement & theare code.
  • Q2. 2.Concrete mix design.
  • Ans. 

    Concrete mix design involves determining the proportions of ingredients to create a specific concrete mixture.

    • The mix design process considers factors such as strength, workability, and durability.

    • Ingredients typically include cement, water, aggregates, and admixtures.

    • The proportions of each ingredient are determined based on the desired properties of the concrete and the specific application.

    • For example, a mix designe...

  • Answered by AI
  • Q3. 3.About cement physical test

Interview Preparation Tips

Interview preparation tips for other job seekers - 1.Need to give right & correct answer.

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Technical round asking about mills outputs
  • Q2. Asking overall lab activities
  • Q3. XRF CALIBRATION , bis norms.
  • Q4. Why u change organization

Interview Preparation Tips

Topics to prepare for Shree Cement Assistant Manager interview:
  • XRF, CALIBRATION
Interview preparation tips for other job seekers - Shree cement Limited is very good organization. Employee welfare also very good.

Interview Questionnaire 

1 Question

  • Q1. Still not provide me anyone accomodation and today I am asking about winter jacket to Mr Abhishek Bhattacharya,but he will say get me jacket after 3 years as well as he will very irretrate me.

I applied via Company Website and was interviewed before Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Question will be asked based on your last 2-3 year major jobs. Focused on depth knowledge on equipment erection, specification of machine and safe work procedure.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare about your resume properly. Maximum questions are to be asked as you write in CV.

Assistant Manager Interview Questions & Answers

JK Cement user image Brijesh Kumar Paul

posted on 19 Dec 2019

I applied via Company Website and was interviewed in Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. What is your responsibilities
  • Q3. Why you join this group

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and technically strong

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Most tripical problem in your job

Interview Preparation Tips

Interview preparation tips for other job seekers - Plase keep environment for working
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Everything about civil engineering
Round 3 - HR 

(1 Question)

  • Q1. Previous jobs experience, weaknesses and strength.
  • Ans. 

    I have previous experience in management roles, with strengths in communication and problem-solving. My weakness is sometimes being too detail-oriented.

    • Previous experience in management roles

    • Strong communication skills

    • Effective problem-solving abilities

    • Occasionally overly focused on details

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - A good company to work with!!
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. One to one round, almost 3 round
  • Q2. Normally general sales & marketing related question,
  • Q3. There were 3 rounds, in which Regional Manager took it, VP took it in the second round, HR took it in the last round.

Interview Preparation Tips

Interview preparation tips for other job seekers - question is related to the old company you worked in.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Take care of complaint & demand generation.
  • Q2. Taking care of loyalty program & Lead generation.
Round 2 - Technical 

(2 Questions)

  • Q1. Technical question
  • Q2. Concrete technology.
Contribute & help others!
anonymous
You can choose to be anonymous

Sagar Cements Interview FAQs

How many rounds are there in Sagar Cements Processing Manager interview?
Sagar Cements interview process usually has 3 rounds. The most common rounds in the Sagar Cements interview process are Technical and Resume Shortlist.
What are the top questions asked in Sagar Cements Processing Manager interview?

Some of the top questions asked at the Sagar Cements Processing Manager interview -

  1. Which types of AFR using and how much TSR rate. How much WHRS power genrated ho...read more
  2. How much heat consumption in your units and which types of fuels used and what ...read more
  3. Which types of refractory use and performances what is the installation cast of...read more

Recently Viewed

INTERVIEWS

eClerx

No Interviews

INTERVIEWS

eClerx

No Interviews

JOBS

Pinch

No Jobs

JOBS

Mascop Facility Services

No Jobs

JOBS

Chatrabhuj Narsee School

No Jobs

JOBS

JLL

No Jobs

INTERVIEWS

JLL

No Interviews

JOBS

Skill-ed Kindergarten

No Jobs

JOBS

JLL

No Jobs

JOBS

Intelegain Technologies

No Jobs

Tell us how to improve this page.

Sagar Cements Processing Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

UltraTech Cement Interview Questions
4.2
 • 572 Interviews
JK Cement Interview Questions
4.1
 • 255 Interviews
ACC Interview Questions
3.9
 • 189 Interviews
Shree Cement Interview Questions
3.8
 • 155 Interviews
Ambuja Cements Interview Questions
3.9
 • 108 Interviews
JSW Cement Interview Questions
4.1
 • 103 Interviews
Nuvoco Vistas Interview Questions
4.1
 • 94 Interviews
Star Cement Interview Questions
4.0
 • 64 Interviews
HIL Limited Interview Questions
4.1
 • 61 Interviews
View all
Sagar Cements Processing Manager Salary
based on 4 salaries
₹14 L/yr - ₹20 L/yr
38% more than the average Processing Manager Salary in India
View more details

Sagar Cements Processing Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

3.0

Salary

4.0

Job security

3.0

Company culture

2.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Engineer
55 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
48 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
34 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Officer
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Officer
24 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Sagar Cements with

UltraTech Cement

4.2
Compare

Ambuja Cements

3.9
Compare

ACC

3.9
Compare

Shree Cement

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview