Filter interviews by
I applied via Naukri.com
The formula for material quantity depends on the type of material and the shape of the object being measured.
For rectangular objects, the formula is length x width x height
For cylindrical objects, the formula is pi x radius squared x height
For triangular objects, the formula is 1/2 x base x height
The density of the material must also be taken into account when calculating quantity
Concrete cube strength increases with curing time. Generally tested at 7, 14, and 28 days.
Concrete strength is directly proportional to curing time.
The standard curing time for testing concrete cube strength is 28 days.
Concrete strength can be tested earlier at 7 or 14 days for quick results.
The strength of concrete at 28 days is considered as the design strength for construction purposes.
Top trending discussions
based on 1 review
Rating in categories
Civil Site Engineer
11
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Site Engineer
7
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Accountant
4
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Project Engineer
4
salaries
| ₹3 L/yr - ₹10 L/yr |
Quantity Surveyor
4
salaries
| ₹1.8 L/yr - ₹2.4 L/yr |
Hetero Drugs
Emcure Pharmaceuticals
Aptara
Kantar