Upload Button Icon Add office photos

Filter interviews by

Rosa Thermal Power Plant Fitter Interview Questions and Answers

Updated 28 Jul 2021

Rosa Thermal Power Plant Fitter Interview Experiences

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via LinkedIn and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. How many types of surveys are there, which is the first survey?
  • Ans. 

    There are several types of surveys, and the first survey is typically a baseline survey.

    • There are various types of surveys such as customer satisfaction surveys, employee engagement surveys, market research surveys, etc.

    • The first survey is often a baseline survey, which establishes a starting point for future comparisons or measurements.

    • Baseline surveys are conducted to gather initial data or establish benchmarks befor...

  • Answered by AI
  • Q2. How many pegs are required to mark for A-type foundation?
  • Ans. 

    The number of pegs required to mark for A-type foundation depends on the specific requirements of the project.

    • The number of pegs required may vary based on the size and shape of the foundation.

    • The complexity of the design and the presence of any additional features can also affect the number of pegs needed.

    • It is important to consult the project plans and specifications to determine the exact number of pegs required.

    • For...

  • Answered by AI
  • Q3. How much cement is required for tower foundation RCC?
  • Ans. 

    The amount of cement required for a tower foundation RCC depends on various factors such as the size and height of the tower, soil conditions, and design specifications.

    • The quantity of cement is determined by the volume of concrete required for the foundation.

    • The volume of concrete is calculated by multiplying the length, width, and height of the foundation.

    • The cement content in concrete is typically expressed as a per...

  • Answered by AI
  • Q4. Tower foundation line up to see
  • Ans. 

    The question is unclear and does not make sense.

    • The question seems to be incomplete or incorrectly phrased.

    • It is unclear what is meant by 'Tower foundation line up to see'.

    • There is not enough information provided to answer the question.

    • It is recommended to seek clarification or ask for more details.

  • Answered by AI
  • Q5. What is working point for foundation?
  • Ans. 

    The working point for foundation refers to the specific goals and objectives that the foundation aims to achieve.

    • The working point for foundation is determined by its mission and vision.

    • It includes the specific areas or issues the foundation focuses on.

    • For example, a foundation working on education may have a working point of improving literacy rates in underprivileged communities.

    • The working point may also include the...

  • Answered by AI
  • Q6. To What tools are required for tower foundation?
  • Ans. 

    The tools required for tower foundation include concrete mixers, rebar cutters, excavators, and leveling instruments.

    • Concrete mixers are used to mix the concrete for the foundation.

    • Rebar cutters are necessary to cut and shape the reinforcement bars.

    • Excavators are used to dig the foundation hole and remove excess soil.

    • Leveling instruments such as laser levels or spirit levels are used to ensure the foundation is level a

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience for power transmission line job

Interview Questionnaire 

5 Questions

  • Q1. Interview in 3 part
  • Q2. 1, some 10 q math ,
  • Q3. 2, 3 round video q.
  • Q4. Ex company related question
  • Q5. Most only 250 + km ,candidate selected

Interview Preparation Tips

Interview preparation tips for other job seekers - Every video part note ur note book.
Jo bhi apko video m dikhayega interview ke samay

Fitter Interview Questions & Answers

Owens Corning user image Govardhan Gautam

posted on 22 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(5 Questions)

  • Q1. What is your name
  • Q2. Where are you from
  • Q3. Who is there in your house
  • Q4. Do you drive in car
  • Q5. You opretor a computer

I applied via Referral and was interviewed before May 2021. There was 1 interview round.

Round 1 - Training 

(1 Question)

  • Q1. Details about alidhra tex machines and their controls, maintenance in 2 month's, etc

Interview Preparation Tips

Interview preparation tips for other job seekers - I loved to work in textile industry. There are many types of textile industry.

I applied via Walk-in and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. All fitter trade questions

Interview Preparation Tips

Topics to prepare for Mazagon Dock Fitter interview:
  • Fitter
Interview preparation tips for other job seekers - Thanks job seekers to give my opinion

I applied via Job Portal and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Job b. L agro Company
  • Q2. Please One job only I miss you b. L agro Company
  • Q3. I am dinish pal My coalifaction 12th +iti in ncvt
  • Ans. Sir my famly slow life and my culture so beck
  • Answered Anonymously
  • Q4. So very thanks and yourself good job

Interview Preparation Tips

Interview preparation tips for other job seekers - The b. L agro company and food manufacturing the famous oils Indian company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Do u know about drilling oprating
  • Q2. Can u measuring vernier
  • Ans. 

    Yes, vernier calipers can be used to measure various dimensions accurately.

    • Vernier calipers are precision measuring instruments used in various industries.

    • They consist of a main scale and a sliding vernier scale for precise measurements.

    • To measure an object, the jaws of the caliper are placed around it and the reading is taken from the scales.

    • Vernier calipers can measure dimensions such as length, width, depth, and dia...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You must be prepare about ur answer before interview ,always try ur answer may be not too long ,just like oneword answer, its help u for better chance get a job opportunity.

Fitter Interview Questions & Answers

Rourkela Steel Plant user image Rabindranath Raula

posted on 25 May 2022

I applied via Apna Jobs and was interviewed in Apr 2022. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Pipeline use of meterial?
  • Ans. 

    Pipeline use of material involves selecting appropriate materials for construction and maintenance.

    • Materials used in pipelines must be strong, durable, and resistant to corrosion.

    • Common materials used include steel, cast iron, plastic, and concrete.

    • Selection of materials depends on factors like the type of fluid being transported, pressure, temperature, and environmental conditions.

    • For example, steel pipes are commonly...

  • Answered by AI
  • Q2. How to lickage block in pipe line?
  • Ans. 

    To fix a leakage block in a pipeline, identify the location of the leak, shut off the flow, clean and dry the area, apply a suitable sealant or patch, and test for any further leaks.

    • Identify the location of the leakage block in the pipeline.

    • Shut off the flow of the pipeline to prevent further leakage.

    • Clean and dry the area around the leakage block.

    • Apply a suitable sealant or patch to fix the leak.

    • Test the repaired area

  • Answered by AI
  • Q3. How to control water in pipe line?
  • Ans. 

    Water in a pipeline can be controlled through various methods such as valves, pressure regulators, and flow meters.

    • Valves can be used to open or close the pipeline to control the flow of water.

    • Pressure regulators can be installed to maintain a specific pressure level in the pipeline.

    • Flow meters can be used to measure the amount of water flowing through the pipeline.

    • By using a combination of these methods, water flow an...

  • Answered by AI
  • Q4. Name of Ms welding rod ?
  • Ans. 

    Ms welding rod is a type of welding electrode that is commonly used for welding mild steel.

    • Ms welding rod is also known as mild steel welding rod.

    • It is used for joining mild steel components together.

    • The rod is made of mild steel and coated with flux to protect the weld from contamination.

    • It is suitable for both AC and DC welding.

    • Examples of Ms welding rod brands include Lincoln Electric Fleetweld 37 and Hobart H-10.

  • Answered by AI
  • Q5. How to manage oil lickage,?
  • Ans. 

    To manage oil leakage, it is important to identify the source, contain the spill, and clean up the affected area.

    • Identify the source of the oil leakage and stop it if possible.

    • Contain the spill using absorbent materials like booms, socks, or absorbent pads.

    • Prevent the oil from spreading further by creating barriers or using containment booms.

    • Clean up the affected area using appropriate cleaning agents and equipment.

    • Dis...

  • Answered by AI
  • Q6. How to cleen tha pipeline?
  • Ans. 

    To clean a pipeline, you can use various methods such as flushing, pigging, or chemical cleaning.

    • Flushing the pipeline with water or a cleaning solution can remove debris and buildup.

    • Pigging involves using a device called a pig to scrape the inside of the pipeline and remove contaminants.

    • Chemical cleaning involves using specialized chemicals to dissolve or dislodge deposits in the pipeline.

    • Regular maintenance and inspe...

  • Answered by AI
  • Q7. How to pipe line manage?
  • Ans. 

    Pipeline management involves coordinating and optimizing the flow of tasks and resources to ensure efficient and timely completion.

    • Identify and prioritize tasks

    • Allocate resources effectively

    • Monitor progress and adjust as needed

    • Communicate and collaborate with team members

    • Use tools and technology to streamline processes

    • Example: In software development, pipeline management involves planning, coding, testing, and deployin

  • Answered by AI
  • Q8. Which type of spanner use in pipe line.
  • Ans. 

    The type of spanner used in pipeline work is called a pipe wrench.

    • Pipe wrenches are adjustable wrenches used for gripping and turning pipes and fittings.

    • They have serrated jaws that provide a strong grip on the pipe.

    • Pipe wrenches come in different sizes to accommodate various pipe diameters.

    • They are commonly used in plumbing, construction, and maintenance work.

    • Examples of pipe wrench brands include Ridgid, Craftsman, a

  • Answered by AI
  • Q9. Good manner in pipe line.
  • Ans. Daily chack lickage and good assembling.
  • Answered by Rabindranath Raula

Interview Preparation Tips

Topics to prepare for Rourkela Steel Plant Fitter interview:
  • Pipeline
Interview preparation tips for other job seekers - I want technician work in our India.
I do in my best.i have axperience.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What is your qualification

Tell us how to improve this page.

Interview Questions from Similar Companies

DY POWER Interview Questions
3.4
 • 5 Interviews
Targray Interview Questions
2.7
 • 5 Interviews
MYSUN Interview Questions
4.1
 • 3 Interviews
View all
Compare Rosa Thermal Power Plant with

Jyoti Structures

3.6
Compare

Aqua Tech Systems

4.1
Compare

KK Wind Solutions

4.0
Compare

DY POWER

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview