I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.
PLC is a programmable logic controller used for industrial automation. SCADA is a supervisory control and data acquisition system.
PLC is a digital computer used to control industrial processes
It receives inputs from sensors and controls outputs to actuators
SCADA is a software system used to monitor and control industrial processes
It collects data from PLCs and displays it to operators
Examples of PLC applications includ...
PLC scan time is the time taken by a PLC to complete one cycle of scanning.
PLC scan time is the time taken by a PLC to read inputs, execute the program, and update outputs.
It is important to keep the scan time as low as possible to ensure efficient operation of the system.
Factors affecting scan time include the complexity of the program, the number of I/O points, and the speed of the processor.
Scan time can be reduced ...
Top trending discussions
I applied via LinkedIn and was interviewed in Sep 2022. There were 5 interview rounds.
Mcq related aptitude, during this you have to choice 4 option and tick the correct answer
I applied via LinkedIn and was interviewed in Sep 2022. There were 5 interview rounds.
Mcq related aptitude, during this you have to choice 4 option and tick the correct answer
Production Engineer
19
salaries
| ₹2.1 L/yr - ₹4.9 L/yr |
Assistant Manager
14
salaries
| ₹2.4 L/yr - ₹8.5 L/yr |
Graduate Engineer Trainee (Get)
10
salaries
| ₹1.1 L/yr - ₹2.8 L/yr |
Engineer
9
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Design Engineer
8
salaries
| ₹2.6 L/yr - ₹4.8 L/yr |
BHEL
Tata Group
Larsen & Toubro Limited
Thermax Limited