Add office photos
Rochem Separation Systems  logo
Employer?
Claim Account for FREE

Rochem Separation Systems

3.6
based on 228 Reviews
Filter interviews by
Experienced

10+ Rochem Separation Systems Interview Questions and Answers

Updated 24 Jan 2025

Q1. How to calculate ppm of dosing?

Ans.

PPM of dosing can be calculated by dividing the weight of the chemical added by the weight of the solution and multiplying by 1,000,000.

  • Determine the weight of the chemical added

  • Determine the weight of the solution

  • Divide the weight of the chemical by the weight of the solution

  • Multiply the result by 1,000,000 to get the PPM

  • PPM = (Weight of Chemical / Weight of Solution) x 1,000,000

Add your answer
right arrow

Q2. 2.SDI ( Silt denciry index)formula of SDI?

Ans.

SDI formula is used to measure the amount of silt or suspended solids in water.

  • SDI = (log(R1/R2) x 1000)/n

  • R1 is the initial flow rate of water through a filter

  • R2 is the flow rate after a certain period of time

  • n is the number of filters used in the test

Add your answer
right arrow

Q3. Criteria of membranes

Ans.

Criteria of membranes refer to the characteristics that determine their effectiveness in separating substances.

  • Pore size

  • Selectivity

  • Permeability

  • Chemical compatibility

  • Mechanical strength

Add your answer
right arrow

Q4. What parameters need to be checked in ETP

Ans.

Parameters to check in ETP include pH level, temperature, turbidity, dissolved oxygen, and chemical dosing.

  • pH level

  • Temperature

  • Turbidity

  • Dissolved oxygen

  • Chemical dosing

Add your answer
right arrow
Discover Rochem Separation Systems interview dos and don'ts from real experiences

Q5. What is COD, Biochemical Oxygen Demand, FM ratio

Ans.

COD is Chemical Oxygen Demand, BOD is Biochemical Oxygen Demand, FM ratio is Food to Microorganism ratio.

  • COD is a measure of the amount of oxygen required to chemically oxidize organic matter in water.

  • BOD is a measure of the amount of oxygen required by microorganisms to break down organic matter in water.

  • FM ratio is the ratio of food (organic matter) to microorganisms in a biological treatment system.

  • Example: A high COD level in water indicates high organic pollution, while ...read more

Add your answer
right arrow

Q6. How to achieve final water parameters

Ans.

Achieving final water parameters involves proper testing, treatment, and monitoring.

  • Perform regular water testing to monitor parameters such as pH, chlorine levels, and turbidity

  • Adjust treatment methods based on test results to maintain optimal water quality

  • Implement proper filtration systems to remove impurities and contaminants

  • Regularly monitor and maintain equipment to ensure efficient operation

  • Train staff on proper water treatment procedures and protocols

Add your answer
right arrow
Are these interview questions helpful?

Q7. What is aerobic and anaerobic digestor.Explain FM ratio

Ans.

Aerobic and anaerobic digesters are systems used to break down organic matter. FM ratio is the ratio of food waste to microorganisms in the digester.

  • Aerobic digester uses oxygen to break down organic matter, while anaerobic digester operates without oxygen.

  • Aerobic digesters are faster but require more energy, while anaerobic digesters are slower but more energy efficient.

  • FM ratio (Food to Microorganism ratio) is the ratio of food waste to microorganisms in the digester, indic...read more

Add your answer
right arrow

Q8. How to design ETP?

Ans.

Designing an ETP involves determining the required treatment processes, sizing the equipment, and ensuring compliance with regulations.

  • Identify the type and volume of wastewater to be treated

  • Select appropriate treatment processes such as physical, chemical, and biological

  • Size the equipment based on the flow rate and characteristics of the wastewater

  • Consider factors like space availability, budget, and regulatory requirements

  • Ensure proper maintenance and monitoring procedures ...read more

Add your answer
right arrow
Share interview questions and help millions of jobseekers 🌟
man with laptop

Q9. 2. What is Aerobic and Anaerobic digestor. Explain FM ratio

Add your answer
right arrow

Q10. Explain about ETP

Ans.

ETP stands for Effluent Treatment Plant, which is used to treat wastewater before it is discharged into the environment.

  • ETP removes contaminants from wastewater through physical, chemical, and biological processes.

  • It helps in reducing the pollution load in water bodies by treating industrial effluents.

  • Common processes in ETP include screening, sedimentation, biological treatment, and disinfection.

  • ETP plays a crucial role in maintaining environmental sustainability and complia...read more

Add your answer
right arrow

Q11. Do you know anything about RO system..?

Add your answer
right arrow

Q12. 3. What is mean by compact STP

Add your answer
right arrow

Q13. 1. Draw and explain ETP flow charts

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Rochem Separation Systems

based on 11 interviews
Interview experience
3.6
Good
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

BYJU'S Logo
3.1
 • 686 Interview Questions
L&T Construction Logo
4.0
 • 575 Interview Questions
Google Logo
4.4
 • 452 Interview Questions
Samsung Logo
3.9
 • 396 Interview Questions
Cummins Logo
4.3
 • 191 Interview Questions
Zomato Logo
3.8
 • 150 Interview Questions
View all
Recently Viewed
INTERVIEWS
Puzzolana Machinery Fabricators
No Interviews
INTERVIEWS
Puzzolana Machinery Fabricators
No Interviews
INTERVIEWS
Puzzolana Machinery Fabricators
No Interviews
INTERVIEWS
Puzzolana Machinery Fabricators
No Interviews
INTERVIEWS
Puzzolana Machinery Fabricators
No Interviews
INTERVIEWS
Rochem Separation Systems
No Interviews
INTERVIEWS
Hyundai Construction Equipment
No Interviews
INTERVIEWS
Hyundai Construction Equipment
No Interviews
LIST OF COMPANIES
Puzzolana Machinery Fabricators
Locations
SALARIES
Puzzolana Machinery Fabricators
Top Rochem Separation Systems Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter