Add office photos
Engaged Employer

Renom Energy Services

4.3
based on 221 Reviews
Filter interviews by

20+ Sharp & Tannan Associates Interview Questions and Answers

Updated 22 Jan 2025
Popular Designations

Q1. 1. How Pitch system will work with entire process with diagram?

Ans.

The pitch system in engineering controls the angle of the blades on a wind turbine or aircraft to optimize performance.

  • Pitch system adjusts blade angle to control speed and power output

  • Can be controlled manually or automatically based on wind conditions

  • Diagram should show blades connected to pitch system and control mechanism

Add your answer

Q2. 2. How power will be converter & match grid parameters?

Ans.

Power can be converted and matched to grid parameters using power converters and control systems.

  • Use power converters such as inverters to convert power from DC to AC or vice versa.

  • Implement control systems to ensure the converted power matches the grid parameters.

  • Adjust parameters such as voltage, frequency, and phase angle to match the grid requirements.

  • Utilize communication protocols like Modbus or DNP3 for grid integration.

  • Perform testing and validation to ensure complian...read more

Add your answer

Q3. I am from Gearless technology. 1. How Pitch system will work?

Ans.

The Pitch system in Gearless technology controls the angle of the blades to optimize energy production.

  • Pitch system adjusts the angle of the blades based on wind conditions to maximize energy output.

  • It helps in protecting the turbine from damage during high wind speeds by adjusting the blade angle.

  • Pitch system can be controlled manually or automatically depending on the turbine design.

  • Examples of Pitch system in action can be seen in wind turbines where the blades adjust thei...read more

View 1 answer

Q4. 5. Distinguish between different models of Enercon Turbine?

Ans.

Enercon Turbines have different models based on size, capacity, and technology.

  • E-48/800 kW - small size, suitable for low wind speed areas

  • E-82/2 MW - medium size, suitable for moderate wind speed areas

  • E-126/7.5 MW - large size, suitable for high wind speed areas

  • Different models have varying rotor diameters, hub heights, and power outputs

Add your answer
Discover Sharp & Tannan Associates interview dos and don'ts from real experiences

Q5. 3. How Performance of the turbine evaluated

Ans.

The performance of a turbine is evaluated by measuring key parameters such as efficiency, power output, and heat rate.

  • Efficiency is calculated by dividing the actual power output by the theoretical power output.

  • Power output is measured in kilowatts or megawatts.

  • Heat rate is the amount of fuel required to produce a unit of electricity.

  • Performance can also be evaluated by monitoring vibration levels, temperature, and pressure.

  • Regular maintenance and tuning can improve turbine p...read more

Add your answer

Q6. What types of errors did you solve on the machine?

Ans.

I have solved errors related to software bugs, hardware malfunctions, calibration issues, and communication failures on the machine.

  • Software bugs: Debugging code to fix issues with program logic or functionality.

  • Hardware malfunctions: Repairing or replacing faulty components to restore machine operation.

  • Calibration issues: Adjusting settings to ensure accurate measurements or performance.

  • Communication failures: Troubleshooting network connections or data transfer problems.

  • Exa...read more

Add your answer
Are these interview questions helpful?

Q7. 3.. Power flow & Control flow of Enercon WEC?

Ans.

Power flow & Control flow of Enercon WEC involves the generation of electricity from wind energy and the management of power output.

  • Power flow in Enercon WEC involves converting kinetic energy from wind into electrical power through the rotation of the turbine blades.

  • Control flow includes monitoring wind speed, adjusting blade pitch angle, and regulating generator output to optimize power generation.

  • Enercon WECs use advanced control systems to ensure efficient power flow and ...read more

Add your answer

Q8. 3. What is the Present LPA?

Ans.

The Present LPA refers to the current annual salary of the individual.

  • Present LPA stands for Present Last Payable Amount.

  • It is the current annual salary of the individual.

  • It is important for employers to know the Present LPA of potential employees to determine salary expectations.

  • Candidates can negotiate their salary based on their Present LPA.

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. 4. What is the expected LPA?

Ans.

The expected LPA (Lakhs Per Annum) is the average annual salary that an engineer can expect to earn.

  • The expected LPA can vary based on factors such as experience, education, industry, and location.

  • For example, a fresh graduate engineer may have an expected LPA of 3-6 lakhs, while a senior engineer with years of experience may have an expected LPA of 10-20 lakhs.

  • Engineers working in industries like IT or oil and gas tend to have higher expected LPA compared to engineers in oth...read more

Add your answer

Q10. 2. How will excitation starts?

Ans.

Excitation starts by applying a voltage to the field winding of the generator.

  • Excitation starts by applying a voltage to the field winding of the generator.

  • This voltage creates a magnetic field in the generator's rotor.

  • The magnetic field induces a voltage in the stator windings, which generates electricity.

  • Excitation can be achieved through various methods such as self-excitation, separate excitation, or permanent magnet excitation.

View 1 answer

Q11. 7. Optical communication of E48 turbine?

Ans.

The E48 turbine uses optical communication for data transmission.

  • Optical communication involves using light to transmit data instead of electrical signals.

  • Fiber optic cables are commonly used in optical communication for their high bandwidth and low interference.

  • Optical communication in the E48 turbine may be used for monitoring and controlling various parameters such as temperature, pressure, and speed.

Add your answer

Q12. 4.How to improve PLF

Ans.

To improve PLF, focus on optimizing equipment performance, reducing downtime, and increasing operational efficiency.

  • Regular maintenance and servicing of equipment to ensure optimal performance

  • Implementing predictive maintenance techniques to reduce downtime

  • Investing in automation and technology to increase operational efficiency

  • Training staff on best practices and efficient operation of equipment

  • Monitoring and analyzing data to identify areas for improvement

Add your answer

Q13. What is the GWO & how to work GWO

Ans.

GWO stands for Global Wind Organization, a non-profit body that sets safety training standards for the wind industry.

  • GWO provides standardized safety training for personnel working in the wind industry

  • Training modules cover areas such as first aid, manual handling, fire awareness, and working at heights

  • GWO certification is often required for individuals working on wind farms or in related roles

Add your answer

Q14. What is Convertor and It's working

Ans.

A convertor is an electronic device that converts one form of electrical energy to another.

  • Converts AC to DC or vice versa

  • Used in power electronics

  • Examples include rectifiers, inverters, and DC-DC converters

Add your answer

Q15. What is the current location

Ans.

The current location is at the interview venue.

  • The current location is at [Interview Venue Address].

  • The interview is taking place at [Interview Room Number].

  • The interview location is [City, State].

Add your answer

Q16. What is ISO

Ans.

ISO stands for International Organization for Standardization, which sets international standards for various industries.

  • ISO develops and publishes international standards to ensure quality, safety, and efficiency in products and services.

  • ISO standards cover a wide range of industries such as manufacturing, healthcare, food safety, and environmental management.

  • ISO certification demonstrates that a company meets the requirements of specific ISO standards.

  • Examples of ISO standa...read more

Add your answer

Q17. Standard code of PPES

Ans.

Standard code of PPES refers to the regulations and guidelines set by authorities for Personal Protective Equipment.

  • PPES should meet the standards set by organizations like OSHA or ANSI.

  • Examples include ANSI/ISEA 107-2015 for high-visibility safety apparel.

  • PPES should be properly maintained and used according to manufacturer instructions.

  • Regular inspections and training on proper usage are essential for compliance.

Add your answer

Q18. Working at height standard

Ans.

Working at height standard refers to regulations and guidelines that ensure safety when working at elevated levels.

  • Working at height standard includes regulations such as OSHA 1926.501 for construction industry.

  • Employers must provide proper training, equipment, and fall protection measures for workers.

  • Regular inspections of equipment and work areas should be conducted to ensure safety.

  • Examples of working at height activities include roof work, scaffolding, and ladder use.

Add your answer

Q19. Types of WTG module

Ans.

There are two main types of WTG modules: nacelle and tower.

  • Nacelle module houses the generator, gearbox, and other components.

  • Tower module supports the nacelle and rotor blades.

  • Examples: Vestas V90 nacelle module, Siemens Gamesa tower module.

Add your answer

Q20. How many experiences in wind energy,

Ans.

I have 3 years of experience in wind energy.

  • I have worked for a renewable energy company for 3 years, specializing in wind energy projects.

  • During my time in wind energy, I have successfully managed the installation and maintenance of multiple wind turbines.

  • I have a strong understanding of the technical aspects of wind energy, including wind resource assessment and turbine performance analysis.

View 1 answer

Q21. Syncronous & Asynchronous Difference

Ans.

Synchronous communication involves data transfer at a fixed time interval, while asynchronous communication involves data transfer without a fixed time interval.

  • Synchronous communication requires a clock signal to synchronize the sender and receiver.

  • Asynchronous communication uses start and stop bits to indicate the beginning and end of a data packet.

  • Examples of synchronous communication include SPI and I2C protocols.

  • Examples of asynchronous communication include UART and USB...read more

Add your answer

Q22. What is induction Generator

Ans.

An induction generator is a type of asynchronous generator that produces electrical power from mechanical energy.

  • It operates on the principle of electromagnetic induction

  • It does not require a separate DC source for excitation

  • It is commonly used in wind turbines and hydroelectric power plants

  • It is less expensive and requires less maintenance compared to synchronous generators

Add your answer

Q23. What is DIFG

Ans.

DIFG is not a commonly known acronym in the field of Electrical Engineering.

  • DIFG does not appear to be a standard term or acronym in the field of Electrical Engineering.

  • It is possible that DIFG may refer to a specific company or product, but without more context it is difficult to say for sure.

  • It is recommended to ask for clarification or context when encountering unfamiliar terms or acronyms in the field of Electrical Engineering.

Add your answer

Q24. Operation and maintenance work?

Ans.

Operation and maintenance work involves the tasks and responsibilities associated with operating and maintaining equipment or systems.

  • Operation work includes tasks such as starting, stopping, and monitoring equipment or systems.

  • Maintenance work involves inspecting, repairing, and replacing components to ensure proper functioning.

  • Operation and maintenance work may require troubleshooting issues and implementing corrective actions.

  • Regular maintenance schedules and procedures ar...read more

Add your answer

Q25. Previous company exprience

Ans.

I have 2 years of experience working as a Mechanical Engineer at XYZ Company.

  • Designed and implemented mechanical systems for various projects

  • Collaborated with cross-functional teams to ensure project success

  • Performed testing and analysis to improve product performance

  • Managed project timelines and budgets effectively

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Sharp & Tannan Associates

based on 26 interviews
Interview experience
4.6
Excellent
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.4
 • 645 Interview Questions
4.4
 • 430 Interview Questions
4.0
 • 277 Interview Questions
4.3
 • 189 Interview Questions
3.8
 • 136 Interview Questions
View all
Top Renom Energy Services Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter