Rebar Design Detail Estimator Interview Questions and Answers

Updated 10 Dec 2017

Rebar Design Detail Estimator Interview Experiences

1 interview found

Estimator Interview Questions & Answers

user image Tha-ju-deen s

posted on 10 Dec 2017

Interview Questionnaire 

2 Questions

  • Q1. Why choose this company
  • Ans. 

    This company offers competitive salaries, opportunities for growth, and a positive work environment.

    • Competitive salaries compared to industry standards

    • Opportunities for growth and advancement within the company

    • Positive work environment with supportive team members

    • Company values work-life balance and employee well-being

  • Answered by AI
  • Q2. Technical question

Interview Preparation Tips

Round: Test
Experience: Technical test

Interview questions from similar companies

I applied via Walk-in and was interviewed before Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is TPM?
  • Ans. 

    TPM stands for Total Productive Maintenance, a system that aims to maximize equipment effectiveness and minimize downtime.

    • TPM involves regular maintenance and inspection of equipment to prevent breakdowns

    • It also includes training employees to operate and maintain equipment properly

    • TPM aims to create a culture of continuous improvement and teamwork

    • Examples of TPM tools include visual management, autonomous maintenance, ...

  • Answered by AI
  • Q2. How you plan routine maintenance for your plant ?
  • Q3. What is MTTR?
  • Ans. 

    MTTR stands for Mean Time To Repair. It is the average time taken to repair a system or equipment after a failure.

    • MTTR is a key metric used in maintenance management.

    • It helps in measuring the efficiency of maintenance processes.

    • MTTR can be calculated by dividing the total downtime by the number of repairs.

    • For example, if a machine was down for a total of 10 hours and it took 2 repairs to fix it, the MTTR would be 5 hou...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I was interviewed for vacancy of maintenance manager so be ready with all theoretical questions.

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basics of Electrical Engineering, some important formulae. Details of Internships & industrial training like what have you learnt, what was the industry process & discipline related questions with respect ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare & focus mainly on your final project.

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I appeared for an interview before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 746 Interviews
Tata Projects Interview Questions
4.2
 • 432 Interviews
KEC International Interview Questions
4.0
 • 300 Interviews
Tata Technologies Interview Questions
3.6
 • 259 Interviews
TCE Interview Questions
3.8
 • 248 Interviews
View all
Rebar Detailer
29 salaries
unlock blur

₹1.8 L/yr - ₹6.5 L/yr

Cadd Designer
22 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

Senior CAD Designer
18 salaries
unlock blur

₹3.3 L/yr - ₹6 L/yr

Senior rebar detailer
7 salaries
unlock blur

₹3.5 L/yr - ₹5 L/yr

Detailing Engineer
6 salaries
unlock blur

₹1 L/yr - ₹3.7 L/yr

Explore more salaries
Compare Rebar Design Detail with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview