Filter interviews by
I applied via Recruitment Consultant and was interviewed before Jan 2019. There was 1 interview round.
I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.
On average, 1 blaster of SA 2.5 Standard can cover approximately 600-800 square feet in 8 hours.
1 blaster of SA 2.5 Standard can cover around 600-800 square feet in 8 hours
The coverage may vary based on factors like surface texture, application method, and experience of the painter
For example, a smooth surface may require less material compared to a rough surface
The minimum profile required in SA2.5 is 50 microns, while the maximum profile is 85 microns.
Minimum profile required in SA2.5 is 50 microns
Maximum profile allowed in SA2.5 is 85 microns
Profile measurement is crucial for ensuring proper adhesion of coatings
Top trending discussions
posted on 25 Dec 2019
I applied via Naukri.com and was interviewed in Jun 2019. There was 1 interview round.
posted on 25 Dec 2019
I applied via Naukri.com and was interviewed in Jun 2019. There was 1 interview round.
Interview experience
based on 2 reviews
Rating in categories
Piping Engineer
13
salaries
| ₹1.7 L/yr - ₹7 L/yr |
Fireman
10
salaries
| ₹0.9 L/yr - ₹2.5 L/yr |
Safety Officer
9
salaries
| ₹2.3 L/yr - ₹5.9 L/yr |
Instrument Engineer
8
salaries
| ₹3.6 L/yr - ₹9.1 L/yr |
Project Engineer
6
salaries
| ₹2.7 L/yr - ₹10 L/yr |
CTS Consulting & Technical Support
Patel Infrastructure
J K Fenner
Saudi Binladin Group