Filter interviews by
Clear (1)
Top trending discussions
I applied via Naukri.com and was interviewed before Apr 2021. There were 3 interview rounds.
Answering questions related to sales cycle, current role, target achievement, negotiation, and travel.
Ideal sales cycle involves identifying potential customers, building relationships, understanding their needs, presenting solutions, and closing the deal.
In my current role, I am responsible for managing a team of sales representatives, developing sales strategies, and achieving sales targets.
I have consistently achiev...
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
To lead a team towards achieving company goals through strategic planning, effective communication, and continuous development.
Develop and implement strategic plans to achieve company objectives
Provide clear direction and support to team members
Continuously assess and improve team performance
Stay updated on industry trends and adapt strategies accordingly
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
There are various types of engines used in construction equipment.
Diesel engines are commonly used in construction equipment due to their high torque and fuel efficiency.
Gasoline engines are also used in smaller construction equipment.
Electric engines are becoming more popular for their low noise and zero emissions.
Hybrid engines combine the benefits of both diesel and electric engines.
Some construction equipment may a...
I was interviewed before May 2016.
I have strong leadership and communication skills that are better suited for a non-technical role.
I excel in managing teams and resolving conflicts
I have a knack for strategic planning and decision-making
I enjoy interacting with customers and providing excellent service
posted on 25 Oct 2017
I was interviewed before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
based on 3 interviews
Interview experience
based on 10 reviews
Rating in categories
Assistant Manager
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Elecon Engineering
Bharat Gears
Shanthi Gears
Altra Industrial Motion India