i
Precision Group
Filter interviews by
How can work in Group teams work
What is your behaviour for your client
Top trending discussions
Plant heat rate is a measure of how efficiently a power plant converts fuel into electricity.
Plant heat rate is typically measured in British thermal units (BTUs) per kilowatt-hour (kWh).
A lower heat rate indicates higher efficiency, as less fuel is needed to produce the same amount of electricity.
Factors affecting heat rate include the type of fuel used, the age and condition of the plant's equipment, and operating co...
Dvara operator and fild operator
Parameterization involves defining and setting values for variables in a system or process.
Identify the variables that need to be parameterized
Determine the appropriate values for each variable
Set the values for the variables in the system or process
Test the system or process to ensure it is functioning as expected
Feeding water under oil grease is not recommended as it can cause contamination and reduce lubrication effectiveness.
Water and oil do not mix well, and introducing water into a grease can cause it to break down and lose its lubricating properties.
Contamination from water can also lead to corrosion and damage to machinery.
It is important to use the appropriate lubricant for the specific application and to avoid introduc...
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There was 1 interview round.
Process is a series of actions or steps taken in order to achieve a particular goal or outcome.
A process involves a sequence of steps or tasks that are performed in a specific order.
It is a systematic approach to accomplishing a task or achieving a desired result.
Processes can be documented and standardized to ensure consistency and efficiency.
Examples include manufacturing processes, customer service procedures, and p
Parameters are the measurable factors that define the performance or behavior of a system, process, or activity.
Parameters help in setting goals and evaluating performance.
They can include factors such as cost, quality, efficiency, and customer satisfaction.
For example, in operations management, parameters could be production output, inventory levels, and lead times.
based on 1 review
Rating in categories
System Engineer
313
salaries
| ₹1.5 L/yr - ₹4.3 L/yr |
Senior Systems Engineer
72
salaries
| ₹2 L/yr - ₹5.8 L/yr |
Desktop Support Engineer
54
salaries
| ₹1.6 L/yr - ₹3.5 L/yr |
Associate Systems Engineer
20
salaries
| ₹1.8 L/yr - ₹3 L/yr |
System Administrator
19
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra