Filter interviews by
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Normal . Keep calm stay focused. Study hard work smart.
Great
It was a good easy level test and prior preparation is importanat
I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.
I am a dedicated Quality Engineer with a strong background in ensuring product quality and compliance with industry standards.
Experienced in conducting quality audits and inspections
Skilled in root cause analysis and implementing corrective actions
Proficient in using quality tools such as FMEA, Control Charts, and Pareto Analysis
I handle conflict by actively listening, seeking common ground, and finding solutions collaboratively.
I approach conflicts with a calm and rational mindset
I actively listen to all parties involved to understand their perspectives
I seek common ground and areas of agreement to build a foundation for resolution
I work collaboratively with others to find mutually beneficial solutions
I am open to feedback and willing to comp
7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.
1. Check sheets: Used to collect and analyze data in a systematic way.
2. Pareto chart: Helps identify the most significant factors contributing to a problem.
3. Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
4. Histogram: Represents data distribution...
The least count of a micrometer is the smallest measurement that can be read on the scale of the micrometer.
The least count of a micrometer is typically 0.01 mm or 0.001 mm depending on the type of micrometer.
It is determined by the number of divisions on the thimble and the pitch of the screw.
For example, a micrometer with 50 divisions on the thimble and a pitch of 0.5 mm would have a least count of 0.01 mm.
STLC (Software Testing Life Cycle) outlines the phases of software testing from planning to closure.
1. Requirement Analysis: Understand testing requirements based on specifications.
2. Test Planning: Define the scope, resources, and schedule for testing activities.
3. Test Case Design: Create detailed test cases and scenarios to validate functionality.
4. Test Environment Setup: Prepare the environment where testing will ...
Waits in Selenium manage timing issues during automated testing, ensuring elements are ready for interaction.
Implicit Wait: Sets a default wait time for the entire session. Example: driver.manage().timeouts().implicitlyWait(10, TimeUnit.SECONDS);
Explicit Wait: Waits for a specific condition to occur before proceeding. Example: WebDriverWait wait = new WebDriverWait(driver, 10); wait.until(ExpectedConditions.visibilityO...
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
I was interviewed before Jan 2024.
posted on 29 Jun 2015
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Electrical Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Surveyor
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Coca-Cola Company
Dhoot Transmission
Genius Consultants
Apotex Research