Q1. Computing process of co-ordinte from drawing. Mostly circle .
The process of computing coordinates from a drawing, particularly circles.
Identify the center point of the circle on the drawing.
Measure the radius of the circle accurately.
Use mathematical formulas to calculate the coordinates of points on the circle.
Consider any scaling or transformation factors applied to the drawing.
Verify the computed coordinates by comparing them with known reference points.
Q2. How you identify, if cs material used behalf of ltcs
CS and LTCS materials can be identified by their carbon content and impact testing results.
Check the material test report (MTR) for carbon content and impact testing results
CS materials typically have a carbon content of 0.25% or higher, while LTCS materials have a carbon content of 0.15% or lower
LTCS materials also require impact testing at low temperatures to ensure their toughness
Visual inspection of the material may also reveal differences in color or surface finish
Q3. What is the procedure of defferenciate between 304 & 316
304 and 316 can be differentiated by their chemical composition and physical properties.
304 contains 18% chromium and 8% nickel while 316 contains 16% chromium, 10% nickel, and 2% molybdenum.
316 is more resistant to corrosion and pitting than 304.
316 is commonly used in marine environments and chemical processing plants while 304 is used in food processing and brewing industries.
The magnetic properties of 304 and 316 also differ, with 304 being magnetic and 316 being non-magn...read more
Q4. On which material and their welding procedure?
The material and welding procedure depend on the specific project requirements and applicable codes and standards.
Material selection is based on factors such as process fluid, temperature, pressure, and corrosion resistance.
Welding procedures are determined by the material being welded, thickness, and joint configuration.
Common materials used in piping include carbon steel, stainless steel, and various alloys.
Welding techniques include SMAW, GTAW, and GMAW.
Codes and standards...read more
Q5. What type of materials you handle there
We handle various materials including metals, plastics, and composites.
We work with different types of metals such as carbon steel, stainless steel, and alloy steel.
We also handle plastics like PVC, HDPE, and PTFE.
Composites like fiberglass and carbon fiber are also part of our materials.
We ensure that all materials meet the required standards and specifications.
We have a strict quality control process to ensure the safety and reliability of our products.
Q6. Calculation of earth work
Calculation of earth work involves determining the volume of earth to be excavated or filled in a construction project.
Earth work calculation is based on the principle of cross-sections.
The area of each cross-section is multiplied by the distance between them to get the volume.
Different methods like average end area, prismoidal formula, or grid method can be used for calculation.
Survey data, including elevations and coordinates, is required for accurate calculations.
Software ...read more
Q7. What is safety consequences management policy?
Safety consequences management policy is a set of guidelines and procedures to address and mitigate potential safety risks and hazards in the workplace.
Establishing clear protocols for reporting and addressing safety incidents
Identifying potential safety hazards and implementing measures to prevent accidents
Training employees on safety procedures and protocols
Conducting regular safety audits and inspections
Developing emergency response plans for different scenarios
Q8. What's the acceptance tolerance of pump alignment?
The acceptance tolerance of pump alignment refers to the allowable deviation from the ideal alignment.
Acceptance tolerance is determined by industry standards and specifications.
It varies depending on the type of pump and its application.
Tolerance can be specified in terms of angular misalignment, parallel offset, and axial displacement.
For example, ANSI/HI 9.6.4 standard specifies a maximum angular misalignment tolerance of 0.1 degrees for centrifugal pumps.
Tolerance limits ...read more
Q9. Do you know mechanical survey work
Yes, I am familiar with mechanical survey work including the use of equipment such as total stations and GPS devices.
I have experience using total stations to measure angles and distances on construction sites.
I am proficient in using GPS devices to accurately determine positions and elevations.
I am knowledgeable about the principles of mechanical survey work and how to apply them in the field.
Q10. How to check centre line of foundation
To check the center line of a foundation, use a measuring tape or string to mark the center point and ensure it aligns with the planned layout.
Measure the width of the foundation and mark the center point using a measuring tape.
Use a string or chalk line to create a straight line from one end of the foundation to the other, passing through the center point.
Check the alignment of the center line with the planned layout or blueprint to ensure accuracy.
Make adjustments as needed...read more
Q11. What is LTI and its calculation formula
LTI stands for Lost Time Injury, a common safety metric in workplaces.
LTI is a safety metric used to track the number of work-related injuries that result in lost work days.
The formula to calculate LTI is (Number of Lost Time Injuries / Total Hours Worked) x 1,000,000.
For example, if a company had 5 lost time injuries in a year and the total hours worked by employees was 1,000,000, the LTI rate would be 5.
Q12. Which type of instruments used
Various instruments such as total stations, GPS receivers, levels, and theodolites are used in land surveying.
Total stations are electronic devices used for measuring angles and distances.
GPS receivers use satellite signals to determine precise locations on the Earth's surface.
Levels are used to determine height differences between points on the ground.
Theodolites are optical instruments used for measuring angles in the horizontal and vertical planes.
Q13. AND HOW TO CONTROL INVENTORY
Inventory can be controlled through proper planning, monitoring, and implementing efficient inventory management techniques.
Implementing a robust inventory management system to track stock levels and reorder when necessary
Regularly conducting physical inventory counts to identify discrepancies and prevent stockouts or overstocking
Setting up reorder points and safety stock levels to ensure availability of critical items
Analyzing sales trends and forecasting demand to optimize ...read more
Q14. HOW TO ISSUE MATTERIAL
Materials can be issued by following a systematic process to ensure accuracy and accountability.
Verify the request against available stock
Prepare the necessary documentation such as issue slips or requisition forms
Record the details of the issuance including quantity, recipient, and purpose
Physically hand over the materials to the authorized recipient
Update the inventory system to reflect the issuance
Q15. Manpower vs productivity
Manpower vs productivity is a comparison between the number of workers and their efficiency in achieving desired outcomes.
Manpower refers to the number of workers available for a task or project.
Productivity measures the efficiency and effectiveness of those workers in achieving desired outcomes.
The relationship between manpower and productivity is important for resource allocation and project success.
Increasing manpower without considering productivity can lead to inefficien...read more
Q16. What is the company policy.
The company policy is to prioritize safety, efficiency, and quality in all maintenance operations.
Company policy emphasizes safety as the top priority in all maintenance activities.
Efficiency is also a key focus, with procedures in place to streamline maintenance processes.
Quality control measures are implemented to ensure that maintenance work meets high standards.
Employees are expected to adhere to all company policies and procedures related to maintenance operations.
Q17. What is duty time table.
A duty time table is a schedule that outlines the specific tasks and responsibilities assigned to individuals within a maintenance team.
Duty time tables typically include information such as shift timings, assigned tasks, equipment maintenance schedules, and contact information for team members.
They help ensure that all necessary maintenance tasks are completed in a timely manner and that team members are aware of their responsibilities.
For example, a duty time table for a ma...read more
Q18. HOW TO PREPARE GRN
Preparing GRN involves verifying received goods, matching with purchase orders, recording details, and updating inventory.
Verify received goods against purchase orders
Record details such as quantity, description, and condition of goods
Update inventory system with the received goods
Match the received goods with the supplier's invoice
Q19. HOW TO DO RICO
RICO stands for Receive, Inspect, Classify, and Organize. It is a method used in inventory management to efficiently handle incoming goods.
Receive all incoming goods and verify against purchase orders
Inspect the quality and quantity of the received goods
Classify the goods based on type, size, and other relevant criteria
Organize the goods in the warehouse for easy access and retrieval
Q20. Explain Isometric and P&ID drawing.
Isometric drawing shows a 3D view of piping while P&ID shows the process flow and equipment layout.
Isometric drawing is used to represent a 3D view of piping and its components.
P&ID drawing shows the process flow and equipment layout in a plant.
Isometric drawing is used for fabrication and installation purposes.
P&ID drawing is used for design, operation, and maintenance purposes.
Isometric drawing shows the dimensions and angles of piping components.
P&ID drawing uses symbols t...read more