I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
To improve cycle time, focus on process optimization and efficiency. Rejection control involves identifying root causes of defects and implementing corrective actions.
Implement lean manufacturing principles to streamline processes and reduce waste
Utilize automation and technology to speed up production
Regularly analyze data and performance metrics to identify bottlenecks and areas for improvement
Train employees on best...
Rework analysis involves identifying and addressing issues in a product or process to improve efficiency and quality.
Rework analysis is a process of examining and evaluating the reasons for rework in a project or product.
It involves identifying root causes of defects or errors and implementing corrective actions to prevent future rework.
Examples of rework analysis include conducting failure mode and effects analysis (F...
Scrap count refers to the number of defective or unusable parts produced during manufacturing.
Scrap count is an important metric in manufacturing to track quality control and efficiency.
It helps identify areas of improvement in the production process.
Examples of scrap count include parts with manufacturing defects, incorrect dimensions, or damaged during production.
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability = (Operating Time / Planned Production Time) * 100
Performance = (Ideal Cycle Time / Total Count) * 100
Quality = (Good Count / Total Count) * 100
OEE = Availability * Performance * Quality
For example, if a machine operate...
Production loss can be managed by identifying root causes, implementing preventive measures, optimizing processes, and continuously monitoring performance.
Identify root causes of production loss through root cause analysis
Implement preventive measures such as regular maintenance, training programs, and quality control checks
Optimize processes by streamlining workflows, improving efficiency, and reducing waste
Continuous...
Lean manufacturing is a production method aimed at minimizing waste and maximizing efficiency.
Focuses on continuous improvement
Eliminates waste in processes
Involves just-in-time production
Uses tools like value stream mapping and 5S
Promotes employee involvement and empowerment
Autonomous maintenance is a maintenance strategy where operators are responsible for routine maintenance tasks.
Autonomous maintenance involves operators taking ownership of basic maintenance tasks such as cleaning, lubricating, and inspecting equipment.
The goal of autonomous maintenance is to prevent breakdowns and improve overall equipment effectiveness.
Operators are trained to identify abnormalities and address them ...
Top trending discussions
posted on 28 Apr 2024
I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.
Mechanical production Engineering Related
posted on 13 Mar 2024
I applied via Referral and was interviewed before Mar 2023. There were 2 interview rounds.
posted on 12 Jan 2022
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
posted on 20 Apr 2022
The least count of a measuring instrument is the smallest value that can be measured with it.
The least count of a vernier caliper is typically 0.02 mm.
The least count of a micrometer is typically 0.01 mm.
The least count of a steam turbine depends on the specific turbine and its design.
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via campus placement at Indo Danish Tool Room, Jamshedpur and was interviewed in Jan 2021. There was 1 interview round.
posted on 31 Jan 2021
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
posted on 3 Nov 2021
based on 1 interview
Interview experience
Graduate Engineer Trainee (Get)
289
salaries
| ₹1.1 L/yr - ₹3.2 L/yr |
Junior Engineer
128
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Production Engineer
37
salaries
| ₹1.4 L/yr - ₹7 L/yr |
Supervisor
24
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Engineer
24
salaries
| ₹3.5 L/yr - ₹5.4 L/yr |
Bosch
Samvardhana Motherson Group
Exide Industries
ZF Commercial Vehicle Control Systems