Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
To improve cycle time, focus on process optimization and efficiency. Rejection control involves identifying root causes of defects and implementing corrective actions.
Implement lean manufacturing principles to streamline processes and reduce waste
Utilize automation and technology to speed up production
Regularly analyze data and performance metrics to identify bottlenecks and areas for improvement
Train employees on best...
Rework analysis involves identifying and addressing issues in a product or process to improve efficiency and quality.
Rework analysis is a process of examining and evaluating the reasons for rework in a project or product.
It involves identifying root causes of defects or errors and implementing corrective actions to prevent future rework.
Examples of rework analysis include conducting failure mode and effects analysis (F...
Scrap count refers to the number of defective or unusable parts produced during manufacturing.
Scrap count is an important metric in manufacturing to track quality control and efficiency.
It helps identify areas of improvement in the production process.
Examples of scrap count include parts with manufacturing defects, incorrect dimensions, or damaged during production.
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability = (Operating Time / Planned Production Time) * 100
Performance = (Ideal Cycle Time / Total Count) * 100
Quality = (Good Count / Total Count) * 100
OEE = Availability * Performance * Quality
For example, if a machine operate...
Production loss can be managed by identifying root causes, implementing preventive measures, optimizing processes, and continuously monitoring performance.
Identify root causes of production loss through root cause analysis
Implement preventive measures such as regular maintenance, training programs, and quality control checks
Optimize processes by streamlining workflows, improving efficiency, and reducing waste
Continuous...
Lean manufacturing is a production method aimed at minimizing waste and maximizing efficiency.
Focuses on continuous improvement
Eliminates waste in processes
Involves just-in-time production
Uses tools like value stream mapping and 5S
Promotes employee involvement and empowerment
Autonomous maintenance is a maintenance strategy where operators are responsible for routine maintenance tasks.
Autonomous maintenance involves operators taking ownership of basic maintenance tasks such as cleaning, lubricating, and inspecting equipment.
The goal of autonomous maintenance is to prevent breakdowns and improve overall equipment effectiveness.
Operators are trained to identify abnormalities and address them ...
Top trending discussions
posted on 29 Oct 2023
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 4 interview rounds.
To improve skill manpower, focus on training programs, mentorship, career development, and recruitment strategies.
Implement regular training programs to enhance skills and knowledge
Provide mentorship opportunities for junior employees to learn from experienced professionals
Offer career development paths and opportunities for advancement within the organization
Revise recruitment strategies to attract top talent with the
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves setting up autonomous maintenance teams, conducting planned maintenance activities, and improving overall equipment efficiency.
TPM also emphasizes training employees to take ownership...
posted on 31 Jan 2023
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
The end-to-end process for wiring harness involves designing, manufacturing, testing, and installation.
Designing the wiring harness based on the electrical requirements and specifications
Manufacturing the harness using automated machines or manual labor
Testing the harness for electrical continuity, insulation resistance, and other parameters
Installing the harness in the vehicle or equipment
Ensuring proper routing and s...
FAI stands for First Article Inspection, a process to verify the initial production run meets all requirements.
FAI from 1 is the initial inspection of the first article produced in a production run
FAI from 2 is the inspection of the first article produced after changes have been made to the production process
FAI from 3 is the inspection of the first article produced after changes have been made to the design or enginee...
posted on 26 Aug 2022
I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
posted on 3 Sep 2022
I applied via Naukri.com and was interviewed before Sep 2021. There was 1 interview round.
posted on 1 Mar 2024
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
posted on 21 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
based on 1 interview
Interview experience
Graduate Engineer Trainee (Get)
288
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
128
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Supervisor
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
Samvardhana Motherson Group
Exide Industries
ZF Commercial Vehicle Control Systems