Q1. How to replace the bucket wheel reclaimer luffing cylinder?

Ans.

To replace the bucket wheel reclaimer luffing cylinder, follow these steps.

  • 1. Shut down the machine and ensure all power sources are disconnected.

  • 2. Remove any surrounding components that may obstruct access to the luffing cylinder.

  • 3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.

  • 4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.

  • 5. Install the new luffing cylinder in the reverse order, e...read more

Add your answer

Q2. How to find bearings details from bearing number.

Ans.

To find bearing details from bearing number, refer to bearing catalogs or manufacturer's website.

  • Refer to bearing catalogs or manufacturer's website for detailed information

  • Search for the bearing number on the manufacturer's website to find specifications, dimensions, load ratings, and other details

  • Consult the bearing catalog to understand the type of bearing, its construction, and its applications

  • Contact the manufacturer or a bearing distributor for assistance in finding spe...read more

View 1 answer

Q3. How to manpower manage and utilise, Documentation what you do, Safety

Ans.

Manpower management involves proper allocation and utilization of resources, documentation ensures accountability, and safety measures are crucial for a secure work environment.

  • Create a detailed manpower plan outlining roles, responsibilities, and tasks for each team member.

  • Regularly assess workload and adjust manpower allocation as needed to ensure efficiency.

  • Implement a documentation system to track progress, identify areas for improvement, and maintain accountability.

  • Train...read more

Add your answer

Q4. What is main reason for belt joint failure?

Ans.

The main reason for belt joint failure is usually due to improper installation or maintenance.

  • Improper installation of the belt joint, such as incorrect alignment or tensioning

  • Lack of proper maintenance, leading to wear and tear of the joint

  • Use of low-quality materials for the joint

  • Excessive load or stress on the belt joint

  • Environmental factors like temperature or humidity affecting the joint

Add your answer
Discover Excelra Knowledge Solutions interview dos and don'ts from real experiences

Q5. What was the alignment maximum tolerance?

Ans.

The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.

  • Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.

  • It is typically expressed in terms of a percentage or a specific measurement unit.

  • For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.

  • Exceeding the alignment maximum tolerance can lead to performance issues or failure.

Add your answer

Q6. What is different between JSA and HIRA?

Ans.

JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.

  • JSA is task-specific, focusing on individual job tasks and potential hazards

  • HIRA is broader, looking at overall workplace hazards and assessing risks

  • JSA involves breaking down a job into steps and identifying potential hazards for each step

  • HIRA involves identifying hazards in the workplace and assessing the ...read more

Add your answer
Are these interview questions helpful?

Q7. What is procedure of pulley replacement?

Ans.

The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.

  • Identify the faulty pulley by checking for any signs of wear or damage.

  • Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.

  • Install the new pulley by aligning it properly and securing it in place.

  • Test the system to ensure the new pulley is functioning correctly and there are no issues.

  • Make sure to f...read more

Add your answer

Q8. How to coal yard management ?

Ans.

Coal yard management involves efficient handling, storage, and transportation of coal.

  • Ensure proper storage and handling of coal to prevent contamination and loss

  • Implement safety measures to prevent accidents and injuries

  • Regularly inspect and maintain equipment to ensure smooth operations

  • Monitor coal inventory and plan for timely replenishment

  • Coordinate with suppliers and transporters for timely delivery of coal

  • Implement measures to minimize environmental impact of coal stora...read more

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. Privious experience of Substation Maintenance and incedent

Ans.

I have 5 years of experience in substation maintenance, including incident response and resolution.

  • Managed regular maintenance schedules for substation equipment

  • Responded to and resolved incidents such as power outages or equipment failures

  • Implemented safety protocols to prevent future incidents

  • Trained team members on proper maintenance procedures

  • Collaborated with engineers to improve substation efficiency

Add your answer

Q10. How create a PR in SAP?

Ans.

To create a PR in SAP, you can use transaction code ME51N or ME21N.

  • Use transaction code ME51N to create a purchase requisition in SAP.

  • Enter the necessary details such as material, quantity, delivery date, etc.

  • Save the purchase requisition and it will be created in the system.

  • Alternatively, you can also use transaction code ME21N to create a purchase order directly.

Add your answer

Q11. How to calculate SCC

Ans.

SCC stands for Social Cost of Carbon and is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions.

  • SCC is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions

  • It takes into account the long-term effects of climate change on agriculture, health, property damage, and other factors

  • The SCC value is used to determine the cost-effectiveness of policies aimed at reducing carbon emissions

  • The calculation of S...read more

Add your answer

Q12. Explain the procedure of PTW?

Ans.

PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.

  • PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.

  • Before starting work, a permit must be obtained from a designated authority.

  • The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken.

  • Workers must follow the instructions on the permit and ad...read more

Add your answer

Q13. How many stages of Turbine blades

Ans.

The number of stages of turbine blades varies depending on the specific turbine design and application.

  • Turbine blades are used in various applications such as gas turbines, steam turbines, and wind turbines.

  • The number of stages in a turbine refers to the number of sets of rotating and stationary blades.

  • Each stage of turbine blades helps to extract energy from the fluid passing through the turbine.

  • Gas turbines typically have multiple stages, ranging from 1 to 20 or more, to ac...read more

View 1 answer

Q14. Where, firstly steam is enter in Turbine

Ans.

Steam enters the turbine at the high-pressure stage.

  • Steam enters the turbine at the high-pressure stage to maximize energy extraction.

  • The high-pressure steam is directed into the turbine blades, causing them to rotate.

  • The steam then passes through multiple stages of the turbine, gradually losing pressure and expanding.

  • At each stage, the steam's energy is converted into mechanical work to drive the turbine.

  • Finally, the low-pressure steam exits the turbine and is condensed back...read more

View 1 answer

Q15. Isolation procedure in the previous plant

Ans.

Isolation procedures in the previous plant were thorough and well-documented.

  • Isolation procedures were clearly outlined in written documents

  • Employees were trained on proper isolation techniques

  • Lockout-tagout procedures were strictly followed

  • Isolation procedures were regularly reviewed and updated

  • Isolation procedures were enforced by supervisors and management

Add your answer

Q16. What is grid code, what is the critical path, what is project performance,

Ans.

Grid code defines technical requirements for connecting to the grid. Critical path is the longest sequence of tasks determining project duration. Project performance measures how well project objectives are being met.

  • Grid code sets out technical standards and requirements for connecting power plants to the grid

  • Critical path is the longest sequence of tasks that determines the overall duration of a project

  • Project performance evaluates how well a project is meeting its objectiv...read more

Add your answer

Q17. What are different types of guarantees and LCs?

Ans.

Guarantees and LCs are financial instruments used in international trade to ensure payment and delivery of goods.

  • Guarantees are issued by banks to ensure payment if the buyer fails to fulfill their obligations.

  • LCs are letters of credit issued by banks to guarantee payment to the seller upon delivery of goods.

  • Types of guarantees include bid bonds, performance bonds, and advance payment guarantees.

  • Types of LCs include revocable, irrevocable, confirmed, and unconfirmed LCs.

  • Guara...read more

Add your answer

Q18. What was my previous plant Capacity ?

Ans.

My previous plant capacity was 5000 units per day.

  • My previous plant had a capacity of 5000 units per day.

  • I was responsible for managing the production of 5000 units per day in my previous plant.

  • The previous plant I worked at had a daily production capacity of 5000 units.

Add your answer

Q19. How to chck soft-foot and wht tpye show in spectrum.

Add your answer

Q20. Total number of bearing in turbine

Ans.

The total number of bearings in a turbine varies depending on its design and size.

  • The number of bearings in a turbine can range from a few to several dozen.

  • The main purpose of bearings in a turbine is to support rotating components and reduce friction.

  • Different types of bearings, such as ball bearings or roller bearings, may be used in a turbine.

  • Large turbines, such as those used in power plants, typically have more bearings compared to smaller turbines.

  • The number and arrange...read more

View 1 answer

Q21. Risk Management - What is it?

Ans.

Risk management is the process of identifying, assessing, and controlling potential risks that could affect a project or organization.

  • It involves identifying potential risks and their likelihood of occurring

  • Assessing the potential impact of each risk on the project or organization

  • Developing strategies to mitigate or avoid the identified risks

  • Monitoring and reviewing the effectiveness of risk management strategies

  • Examples include financial risks, legal risks, and operational r...read more

Add your answer

Q22. Tell me about dynamics balancing?

Add your answer

Q23. How to save energy consumption

Ans.

Energy consumption can be saved by implementing energy-efficient practices and technologies.

  • Use LED light bulbs instead of incandescent ones

  • Install programmable thermostats to regulate heating and cooling

  • Use energy-efficient appliances and equipment

  • Implement energy management systems to monitor and optimize energy usage

  • Encourage employees to turn off lights and equipment when not in use

  • Use renewable energy sources such as solar or wind power

  • Insulate buildings to reduce heatin...read more

Add your answer

Q24. How to manage the client in brief.

Ans.

Managing clients involves clear communication, setting expectations, building relationships, and delivering results.

  • Establish clear communication channels with the client to ensure understanding of project goals and timelines

  • Set realistic expectations and manage client's expectations throughout the project

  • Build a strong relationship with the client based on trust and transparency

  • Regularly update the client on project progress and address any concerns promptly

  • Deliver results t...read more

Add your answer

Q25. Safe startup and shutdown procedure

Ans.

Safe startup and shutdown procedures are essential for ensuring the safety of personnel and equipment.

  • Ensure all equipment is properly inspected and maintained before startup.

  • Follow manufacturer's guidelines for startup and shutdown procedures.

  • Communicate with team members to ensure everyone is aware of the procedures.

  • Have emergency shutdown procedures in place in case of any unforeseen issues.

  • Train all personnel on safe startup and shutdown procedures.

  • Regularly review and up...read more

Add your answer

Q26. How to do balancing of impeller

Add your answer

Q27. What type measure problem solve

Add your answer

Q28. Thermal power plant operations.

Ans.

Thermal power plant operations involve the generation of electricity through the use of heat energy.

  • Thermal power plants use fossil fuels or nuclear energy to produce steam.

  • The steam is used to drive a turbine, which generates electricity.

  • The process involves various components such as boilers, turbines, condensers, and generators.

  • Operations include fuel handling, combustion, steam generation, and electricity distribution.

  • Efficiency, safety, and environmental considerations a...read more

Add your answer

Q29. Types of maintenance

Ans.

Types of maintenance include corrective, preventive, predictive, and proactive maintenance.

  • Corrective maintenance involves fixing a problem after it has occurred.

  • Preventive maintenance involves regularly scheduled maintenance to prevent problems from occurring.

  • Predictive maintenance involves using data and analytics to predict when maintenance is needed.

  • Proactive maintenance involves identifying and addressing potential issues before they become problems.

  • Examples include chan...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Excelra Knowledge Solutions

based on 34 interviews
Interview experience
4.1
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.5
 • 1.8k Interview Questions
4.0
 • 1.2k Interview Questions
3.7
 • 343 Interview Questions
4.1
 • 276 Interview Questions
4.2
 • 218 Interview Questions
4.3
 • 137 Interview Questions
View all
Top NTPC GE Power Services Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter