Filter interviews by
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
posted on 19 Oct 2023
7QC stands for Seven Quality Control Tools, which are a set of techniques used for quality improvement in production processes.
The 7QC include tools such as Pareto charts, cause-and-effect diagrams, scatter diagrams, control charts, histograms, check sheets, and flowcharts.
These tools help identify and solve quality-related issues in production processes.
For example, a Pareto chart can help prioritize the most signific...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM involves empowering operators to take ownership of equipment maintenance
Focuses on preventing breakdowns and improving overall equipment efficiency
Incorporates principles such as autonomous maintenance, planned maintenance, and continuous improvement
Example: Implementing daily equipment che...
TPM target stands for Total Productive Maintenance target, which is a goal set to maximize the efficiency and effectiveness of production equipment.
TPM target is a goal set to minimize equipment downtime and maximize productivity.
It involves proactive maintenance practices to prevent breakdowns and improve overall equipment effectiveness.
Examples of TPM targets include reducing unplanned downtime by 20% or increasing e...
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
Valves are devices used to control the flow of fluids or gases. There are several types of valves used in various industries.
Gate valve
Ball valve
Butterfly valve
Check valve
Globe valve
Needle valve
Diaphragm valve
Pressure relief valve
posted on 4 Nov 2021
I applied via Campus Placement and was interviewed before Nov 2020. There were 4 interview rounds.
posted on 10 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
5S is a methodology for workplace organization and standardization. Clero is not a recognized term in production engineering.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain
It aims to improve efficiency, safety, and quality by organizing and standardizing the workplace
Examples of 5S implementation include color-coding tools, labeling storage areas, and creating visual work instructions
Clero is not a re...
TPM stands for Total Productive Maintenance, a system that aims to maximize equipment effectiveness and minimize downtime.
TPM is a maintenance strategy that involves all employees in the organization
TPM focuses on improving equipment reliability, reducing downtime, and increasing productivity
TPM Pillar refers to the eight key areas of focus in TPM implementation, including autonomous maintenance, planned maintenance, a...
The question is incomplete. Please provide more context.
Please provide more information about the fire in question.
Is it a chemical fire, electrical fire, or a fire caused by combustible materials?
Each type of fire requires a different approach for extinguishing it.
posted on 4 Dec 2023
I applied via Approached by Company and was interviewed before Dec 2022. There were 3 interview rounds.
Practice is the most advocated rool of aptitude test
Assignment is compusry solve all problems
I applied via Job Portal and was interviewed before Sep 2022. There were 3 interview rounds.
Troubleshooting in injection molding machine involves identifying and resolving issues to ensure smooth operation.
Check for any blockages in the machine's nozzle or mold
Inspect the temperature settings to ensure they are correct for the material being used
Verify that the injection pressure and speed are set appropriately
Examine the cooling system to ensure it is functioning properly
Monitor the cycle time and adjust as
Defects in engineering refer to imperfections or flaws in materials or structures. Controlling defects involves identifying, analyzing, and implementing measures to prevent or minimize them.
Identify different types of defects such as cracks, voids, inclusions, and porosity.
Use non-destructive testing methods like ultrasonic testing, radiography, and magnetic particle inspection to detect defects.
Implement quality contr...
I investigate accidents by collecting evidence, interviewing witnesses, analyzing data, and reconstructing the events.
Collect evidence from the accident scene
Interview witnesses to gather information
Analyze data such as CCTV footage or vehicle black box recordings
Reconstruct the events leading up to the accident
Consult with experts if needed, such as accident reconstruction specialists
PPE kit is a set of protective equipment worn to minimize exposure to hazards while working on machines.
PPE kit includes items like gloves, goggles, helmets, masks, and coveralls.
It is used to protect the wearer from physical, electrical, chemical, and biological hazards.
PPE kit is essential to prevent injuries, illnesses, and accidents in the workplace.
For example, wearing gloves can protect hands from cuts and burns
posted on 16 Jan 2024
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
posted on 10 Jan 2025
I appeared for an interview before Jan 2024.
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
Numericals, blood relation, case study
based on 1 interview
Interview experience
Senior Engineer
19
salaries
| ₹5.6 L/yr - ₹8.5 L/yr |
Quality Engineer
13
salaries
| ₹2.1 L/yr - ₹6.5 L/yr |
Production Engineer
8
salaries
| ₹4.8 L/yr - ₹6.8 L/yr |
Junior Engineer
8
salaries
| ₹3 L/yr - ₹4.9 L/yr |
Store Executive
7
salaries
| ₹1.8 L/yr - ₹4.6 L/yr |
Caparo Engineering India
Marelli
Enco Engineers Combine
Seoyon E-hwa Automotive