Filter interviews by
7QC stands for Seven Quality Control Tools, which are a set of techniques used for quality improvement in production processes.
The 7QC include tools such as Pareto charts, cause-and-effect diagrams, scatter diagrams, control charts, histograms, check sheets, and flowcharts.
These tools help identify and solve quality-related issues in production processes.
For example, a Pareto chart can help prioritize the most signific...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM involves empowering operators to take ownership of equipment maintenance
Focuses on preventing breakdowns and improving overall equipment efficiency
Incorporates principles such as autonomous maintenance, planned maintenance, and continuous improvement
Example: Implementing daily equipment che...
TPM target stands for Total Productive Maintenance target, which is a goal set to maximize the efficiency and effectiveness of production equipment.
TPM target is a goal set to minimize equipment downtime and maximize productivity.
It involves proactive maintenance practices to prevent breakdowns and improve overall equipment effectiveness.
Examples of TPM targets include reducing unplanned downtime by 20% or increasing e...
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.
Maintenance jobs are crucial for ensuring the smooth functioning of equipment and preventing breakdowns.
Maintenance jobs involve regular inspections, cleaning, and repairs of equipment.
They help to identify and fix issues before they become major problems.
Proper maintenance can extend the lifespan of equipment and reduce the need for costly replacements.
Examples of maintenance jobs include oil changes, filter replaceme...
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
Good and some communication questions were asked
It was very good and asking dsa answers
I was interviewed in Feb 2023.
Approach in chiller refers to the method or strategy used to control the temperature of the chilled water.
Approach in chiller is the temperature difference between the leaving chilled water and the entering chilled water.
A smaller approach indicates better chiller performance.
Approach can be controlled by adjusting the flow rate of the chilled water or the setpoint of the chiller.
Monitoring approach is important to ens
Factors affecting cooling tower efficiency include water quality, air flow, temperature differentials, and fouling.
Water quality - Impurities in water can reduce heat transfer efficiency.
Air flow - Proper air flow is essential for heat exchange.
Temperature differentials - Larger differentials between hot and cold water improve efficiency.
Fouling - Buildup of scale or debris can decrease efficiency.
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Newspaper Ad and was interviewed in Oct 2024. There were 2 interview rounds.
1. Evaluate communication skills, critical thinking, and teamwork.
2. Assess participants' ability to express ideas coherently and persuasively.
3. Identify leadership qualities, listening skills, and ability to handle disagreement.
Iam middle class family, My father occupation is Mesan, My mother is house wife So very critical situation in my family. so I need money
My strength is Communication, Time Management, Adaptability And my weekness is Overcommitment
I applied via Naukri.com and was interviewed in Oct 2024. There were 4 interview rounds.
Aptitude test are used in schools, by employers, and to help individuals make careers
Group discussion is a structured conversation where people exchange ideas and opinions on a topic
The reporter disappeared on an assignment in the war zone
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Engineer
318
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
129
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Assistant
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Operator
48
salaries
| ₹0 L/yr - ₹0 L/yr |
MRF Tyres
Ceat Tyres
Apollo Tyres
Balkrishna Industries