Filter interviews by
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
Top trending discussions
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
I applied via Recruitment Consulltant and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 28 Jun 2024
I applied via Campus Placement and was interviewed in Dec 2022. There were 2 interview rounds.
About any road ways and types of bridges and classification of is codes for building construction
About any road ways and classification of turnouts.
I applied via Company Website and was interviewed before Dec 2022. There were 4 interview rounds.
I am an experienced Electrical Engineer with a passion for designing and implementing innovative solutions.
I have a strong background in electrical engineering, with a focus on power systems and control systems.
I have successfully designed and implemented electrical systems for various projects, including commercial buildings and industrial plants.
I am skilled in using CAD software for electrical design and have experi...
I can provide the required documents and discuss salary and joining details.
I can provide all necessary documents such as resume, certifications, and transcripts.
My current base salary is $X per year.
I expect a base salary in the range of $Y to $Z per year.
I am available to join within X weeks/months.
I can discuss further details during the interview.
I applied via Referral and was interviewed in Jan 2022. There were 2 interview rounds.
English aptitude reasoning
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Civil Site Engineer
80
salaries
| ₹1.7 L/yr - ₹6 L/yr |
Site Engineer
75
salaries
| ₹1.5 L/yr - ₹5 L/yr |
QA QC Engineer
52
salaries
| ₹1.8 L/yr - ₹5.2 L/yr |
Project Engineer
28
salaries
| ₹4 L/yr - ₹6.6 L/yr |
Senior Engineer
22
salaries
| ₹4.3 L/yr - ₹8.3 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem