3 Questions

  • Q1. How many blocks required in m2?
  • Ans. 

    The number of blocks required in m2 depends on the size of the blocks and the area to be covered.

    • The size of the blocks should be known to calculate the number required.

    • The area to be covered in m2 should also be known.

    • Divide the area by the size of each block to get the number of blocks required.

    • For example, if the area is 100 m2 and each block covers 1 m2, then 100 blocks would be required.

  • Answered by AI
  • Q2. What is an Unit weight of cement and steel?
  • Ans. 

    Unit weight of cement and steel varies depending on their composition and type.

    • Unit weight of cement ranges from 830 to 1650 kg/m³ depending on its type.

    • Unit weight of steel ranges from 7700 to 7850 kg/m³ depending on its composition.

    • Unit weight is an important factor in construction as it affects the overall weight and strength of the structure.

  • Answered by AI
  • Q3. For cement - 1440 kg/m3 and steel - 7850 kg/m3

Interview Preparation Tips

Interview preparation tips for other job seekers - The Interviewer wanted to test both my knowledge and commuication skills.

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 
Round 2 - Coding Test 
Round 3 - Aptitude Test 

1st we got aptitude test which have 40 tech &20 non tech .....and total 500+ candidate was present.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep fundamental clear, all questions were mediam range include all subjects

I applied via Company Website and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Training in rail wheel plant
  • Q2. Technical questions about cp vessel and pressure vessel and equipment
  • Q3. Types of equipment used in piping industry
  • Ans. 

    Various types of equipment are used in the piping industry for different purposes.

    • Pumps

    • Compressors

    • Valves

    • Heat exchangers

    • Filters

    • Storage tanks

    • Piping materials

    • Flanges

    • Gaskets

    • Instrumentation and control systems

  • Answered by AI
  • Q4. What is the standard code of pipe
  • Ans. 

    The standard code of pipe refers to the set of regulations and specifications that govern the design, construction, and use of pipes in various industries.

    • The standard code of pipe varies depending on the industry and the type of pipe being used.

    • For example, in the oil and gas industry, the American Petroleum Institute (API) provides standards for pipes used in drilling and production operations.

    • In the construction ind...

  • Answered by AI
  • Q5. Tell me about isometric drawing
  • Ans. 

    Isometric drawing is a 3D representation of an object on a 2D surface.

    • It shows all three dimensions of an object in a single view.

    • It uses a 30-degree angle for all three axes.

    • It is commonly used in engineering and construction to show piping and structural details.

    • Isometric drawings are often created using computer-aided design (CAD) software.

    • They are useful for visualizing how different parts of a system fit together.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hello sir, I m a project engineer and doing a job for Sparsh Pvt Ltd. So I m seeking a job for best opportunity with my experience.thanku

Skills evaluated in this interview

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mathematics, English, Reasoning

Round 2 - Technical 

(2 Questions)

  • Q1. They asked Technical questions
  • Q2. What is antenna What is satcom
  • Ans. 

    An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.

    • Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.

    • Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...

  • Answered by AI
Round 3 - Group Discussion 

Clean India
Corruption

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and believe in yourself

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake

    NCCCL Interview FAQs

    What are the top questions asked in NCCCL Project Engineer interview for freshers?

    Some of the top questions asked at the NCCCL Project Engineer interview for freshers -

    1. What is an Unit weight of cement and ste...read more
    2. How many blocks required in ...read more
    3. For cement - 1440 kg/m3 and steel - 7850 kg...read more

    Tell us how to improve this page.

    NCCCL Project Engineer Salary
    based on 29 salaries
    ₹4 L/yr - ₹6.6 L/yr
    5% more than the average Project Engineer Salary in India
    View more details

    NCCCL Project Engineer Reviews and Ratings

    based on 8 reviews

    3.6/5

    Rating in categories

    2.8

    Skill development

    2.9

    Work-life balance

    3.2

    Salary

    3.0

    Job security

    2.9

    Company culture

    2.5

    Promotions

    3.6

    Work satisfaction

    Explore 8 Reviews and Ratings
    Civil Site Engineer
    80 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Site Engineer
    75 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    QA QC Engineer
    53 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Project Engineer
    29 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Senior Engineer
    22 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Explore more salaries
    Compare NCCCL with

    Larsen & Toubro Limited

    4.0
    Compare

    Tata Group

    4.2
    Compare

    Reliance Industries

    4.0
    Compare

    Adani Group

    3.9
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview