How many dumpers needed for 15 km how many excavators required

AnswerBot
8mo

The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.

  • The number of dumpers need...read more

Satyaranjan Jena
2mo
5nos Excavator i.e 210 and 15 nos Dumper required.