Upload Button Icon Add office photos

Filter interviews by

Myk Laticrete Production Engineer Interview Questions and Answers

Updated 18 Mar 2024

Myk Laticrete Production Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Mechanical maintenance and production planning

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Training 

(1 Question)

  • Q1. Good training provided and course designed as per plant requirements.

I applied via Company Website and was interviewed in Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Diplom cement technology, cement is a most useful resource.

Round 3 - Technical 

(3 Questions)

  • Q1. 1. Cement manufacturing process .
  • Ans. Crossing, screening, stacking,reclaiming,grounding,free heating,burning,cooling,grainding,add materials prosentes.
  • Answered Anonymously
  • Q2. 2. Cement Row materials
  • Q3. Raw mill vrm boll mill
  • Ans. Grinding unit vrm speed and rpm , boll mill speed
  • Answered Anonymously
Round 4 - Group Discussion 

Vrm rpm speed 20-25 and boll mill rpm speed 25-27

Interview Preparation Tips

Topics to prepare for JK Cement Production Engineer interview:
  • Diploma in Cement technology
Interview preparation tips for other job seekers - Please find the attechment of resume of diploma in cement technology.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical manufacturing process

I applied via Naukri.com and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to increase productivity Smoothly operation
  • Ans. 

    Increasing productivity and smooth operation can be achieved through proper planning, efficient processes, and continuous improvement.

    • Identify bottlenecks and inefficiencies in the production process

    • Implement lean manufacturing principles to eliminate waste and streamline processes

    • Invest in automation and technology to improve efficiency

    • Provide training and development opportunities for employees to enhance their skill...

  • Answered by AI
  • Q2. Plant operation smoothly
  • Ans. 

    Plant operation can be made smooth by implementing efficient processes and regular maintenance.

    • Regular maintenance of equipment and machinery

    • Efficient scheduling of production runs

    • Effective communication between departments

    • Continuous improvement initiatives

    • Proper training of employees

    • Use of automation and technology

    • Monitoring and analysis of production data

    • Implementation of safety protocols

    • Effective inventory managemen

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions good awareness and plant operation

I appeared for an interview in Feb 2022.

Round 1 - Technical 

(2 Questions)

  • Q1. What reason of pin hole in sanitary ware products.
  • Ans. 

    Pin holes in sanitary ware products can be caused by various reasons.

    • Presence of impurities in the raw materials used for manufacturing

    • Inadequate mixing of raw materials

    • Improper firing temperature or duration

    • Poor glaze quality

    • Inadequate cleaning of molds

    • Inadequate drying time

    • Inadequate pressure during casting

    • Presence of air bubbles in the casting material

    • Poor quality control measures

    • Environmental factors such as humidi

  • Answered by AI
  • Q2. Howmany typs of crack
  • Ans. 

    There are several types of cracks that can occur in materials.

    • Fatigue cracks

    • Corrosion cracks

    • Thermal fatigue cracks

    • Brittle cracks

    • Overload cracks

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1- line cerculation, slow presure
2-many typs of crack

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Past Experience as stated on my resume.
  • Q2. Different maintenance related problems faced and solutions provided
  • Ans. 

    Maintenance problems and solutions

    • Equipment breakdowns - regular maintenance checks and repairs

    • Lack of spare parts - inventory management and ordering in advance

    • Inefficient processes - process optimization and automation

    • Safety hazards - regular safety inspections and training

    • Environmental concerns - proper disposal of hazardous waste

    • Budget constraints - prioritization and cost-effective solutions

  • Answered by AI
  • Q3. Project related in depth questions on domain of my working as stated iny resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Be energetic and simply tell how you faced the problems or steps done for erection of particular equipment as stated in the resume.
Be confident and do not over explain as all of the persons taking interviews in JSW Cement are rich in experience of their domain.

I appeared for an interview in Jul 2020.

Interview Questionnaire 

1 Question

  • Q1. Process parameters, fan flow calculation quality related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Aware about mill specifications
Process parameters flow calculation etc.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Stripping Ratio, MMR, Mine Management
  • Q2. Drilling and Blasting, Shot sequence, Safety Plan

I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Project related question

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Rajeev Malik with over 5.2 years of work experience in construction industry.As a dynamic professional I have worked on Industrial and Residential projects of Indianstandards as a Client & Contractor have in depth knowledge of project development ,rightfrom execution stage till commissioning stage.I am well versed with construction procedures & methodologies of these sectors andworked on industry recognized project software’s as a tool to implement the constructionprocess. My job profile is suitable for a Site Incharge including Structure Engineer.On an academic front I am a Civil Engineer with B.tech from GLA University of technology & management Mathura 2017.I am well versed with all the MS office software’s ,AutoCAD .Iwould appreciate an opportunity to discuss my qualifications is suitable for applied post. Iamc omfortable to work with different community with different language of skills.

Myk Laticrete Interview FAQs

How many rounds are there in Myk Laticrete Production Engineer interview?
Myk Laticrete interview process usually has 1 rounds. The most common rounds in the Myk Laticrete interview process are Technical.

Tell us how to improve this page.

Myk Laticrete Production Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more
Myk Laticrete Production Engineer Salary
based on 4 salaries
₹3.5 L/yr - ₹4.5 L/yr
At par with the average Production Engineer Salary in India
View more details
Senior Sales Executive
149 salaries
unlock blur

₹3.4 L/yr - ₹10.8 L/yr

Sales Executive
126 salaries
unlock blur

₹2 L/yr - ₹9.8 L/yr

Area Sales Manager
102 salaries
unlock blur

₹6.5 L/yr - ₹18.9 L/yr

Assistant Manager
45 salaries
unlock blur

₹5.5 L/yr - ₹13 L/yr

Executive Production
38 salaries
unlock blur

₹2.7 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Myk Laticrete with

JK Cement

4.1
Compare

ACC

3.9
Compare

Ambuja Cements

3.9
Compare

Nuvoco Vistas

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview