Filter interviews by
Top trending discussions
posted on 15 Jan 2023
I applied via Naukri.com and was interviewed in Dec 2022. There were 4 interview rounds.
1. Number series
2. Coding and decoding
3. Find the odd one out
4. Statement and conclusion
posted on 22 Jan 2023
I applied via Referral and was interviewed before Jan 2022. There was 1 interview round.
Dross excess control can be achieved by implementing proper process controls and regular maintenance.
Regularly inspect and clean equipment to prevent buildup of dross
Implement process controls to minimize dross formation
Train employees on proper handling and disposal of dross
Monitor and analyze production data to identify areas for improvement
Collaborate with suppliers to ensure quality materials with minimal dross
Util...
To reduce rejection, focus on improving quality control measures and training employees.
Implement a thorough quality control process to catch defects early on
Train employees on proper production techniques and quality standards
Regularly review and analyze rejection data to identify patterns and areas for improvement
Collaborate with suppliers to ensure they are meeting quality standards
Invest in new technology or equipm...
Fuel consumption control can be achieved through proper planning, monitoring, and maintenance.
Develop a fuel consumption plan based on historical data and projected usage
Monitor fuel usage regularly and identify any deviations from the plan
Implement maintenance programs to ensure vehicles and equipment are operating efficiently
Train drivers and operators on fuel-efficient driving techniques
Consider alternative fuel sou...
To control manpower excess, proper planning, forecasting, and monitoring are necessary.
Analyze production data to determine the required workforce
Implement flexible work arrangements like part-time or temporary employment
Cross-train employees to perform multiple tasks
Monitor employee attendance and productivity
Implement a hiring freeze or reduce overtime
Consider outsourcing or automation as alternatives
Communicate with...
Fuel consumption, manpower, charging time, and rejection can be controlled through proper planning and implementation of efficient processes.
Implementing a fuel-efficient driving policy and regular maintenance of vehicles can reduce fuel consumption.
Proper scheduling and allocation of manpower can optimize productivity and reduce unnecessary labor costs.
Investing in fast charging technology and optimizing charging sche...
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 17 Nov 2022
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Referral
I applied via Campus Placement and was interviewed in Apr 2024. There were 3 interview rounds.
Ohm's law states that the current flowing through a conductor is directly proportional to the voltage applied across it, and inversely proportional to the resistance of the conductor.
Ohm's law is represented by the formula V = I * R, where V is voltage, I is current, and R is resistance.
It helps in calculating the current flowing through a circuit when the voltage and resistance are known.
It can also be used to determi...
Diploma last semester assignment
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
A thermal power plant is a facility that generates electricity by converting heat energy into electrical energy.
Thermal power plants use fossil fuels, nuclear energy, or renewable sources like solar or geothermal energy to generate heat.
The heat is used to produce steam, which drives a turbine connected to a generator to produce electricity.
Examples of thermal power plants include coal-fired power plants, gas-fired pow
A building permit is required for construction projects to ensure compliance with building codes and regulations.
Building permit is required for new construction, renovations, alterations, and additions
Permit may also be needed for demolition, electrical work, plumbing work, and HVAC installations
Permit requirements vary by location and type of project
Examples: building a new house, adding a deck, finishing a basement
based on 1 review
Rating in categories
Purchase Officer
10
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Accountant
8
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Automation Engineer
6
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Logistics Executive
6
salaries
| ₹2.2 L/yr - ₹3.1 L/yr |
Executive Officer
6
salaries
| ₹1.4 L/yr - ₹2.4 L/yr |
Hindalco Industries
Rungta Mines
Hindustan Zinc
Vedanta Resources