Paint process involves surface preparation, priming, painting, and curing to achieve a durable and aesthetically pleasing finish.
Surface preparation: Cleaning, sanding, and masking the surface to ensure proper adhesion of the paint.
Priming: Applying a primer to improve paint adhesion and corrosion resistance.
Painting: Applying the desired paint color using techniques like spraying, brushing, or dipping.
Curing: Allowing...
We use high-quality automotive paint specifically designed for durability and a flawless finish.
High-quality automotive paint is used for long-lasting results
The paint is designed to withstand environmental factors and provide a flawless finish
Examples of paint brands commonly used include PPG, Axalta, and Sherwin-Williams
PPM stands for parts per million, a unit of measurement used to represent very small concentrations of substances.
PPM is calculated by dividing the mass of the solute by the total mass of the solution and then multiplying by 1,000,000.
For example, if a solution contains 2 grams of solute in 1000 grams of solution, the PPM would be 2000.
PPM is commonly used in various industries to measure the concentration of pollutant
PPAP stands for Production Part Approval Process. It is a standardized process in the automotive industry to ensure suppliers meet quality standards before production.
PPAP is a set of documents and procedures used to ensure that a supplier's parts meet the customer's requirements.
It includes documentation such as design records, engineering change documents, process flow diagrams, control plans, etc.
PPAP is typically r...
Top trending discussions
I applied via Referral and was interviewed in Aug 2018. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
I have experience with various DevOps tools including Jenkins, Git, Docker, and Ansible.
Jenkins for continuous integration and deployment
Git for version control and collaboration
Docker for containerization and deployment
Ansible for configuration management and automation
Process knowledge & Drawing point.
Cp measures process capability, while Cpk measures process capability adjusted for centering.
Cp only considers the spread of data, while Cpk takes into account both spread and centering of data.
Cp assumes the process is centered within the specification limits, while Cpk adjusts for any deviation from the center.
If Cp is greater than Cpk, it indicates that the process is not centered within the specification limits.
For...
Quality statgy improvement study
Customer handling and management handling
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Sep 2023. There were 4 interview rounds.
based on 1 interview
Interview experience
Engineer
324
salaries
| ₹2 L/yr - ₹7 L/yr |
Assistant Engineer
276
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Senior Engineer
263
salaries
| ₹3.6 L/yr - ₹10.5 L/yr |
Trainee Technician
241
salaries
| ₹1.4 L/yr - ₹3.6 L/yr |
Assistant Manager
237
salaries
| ₹4.8 L/yr - ₹14 L/yr |
Delphi TVS
Belrise Industries
Krishna Maruti
Faurecia