Q1. What is the procedure to start the earthen dam
The procedure to start an earthen dam involves site selection, design, construction, and maintenance.
Site selection involves identifying a suitable location with adequate soil and water resources.
Design involves determining the dam's height, width, and slope, as well as spillway and outlet structures.
Construction involves excavating the foundation, building the embankment, and installing spillway and outlet structures.
Maintenance involves regular inspections, repairs, and mon...read more
Q2. Intial setting time of concrete
Initial setting time of concrete is the time taken by the concrete to reach a particular degree of stiffness.
It is the time taken by the concrete to set and harden.
It is usually measured in hours and minutes.
The initial setting time of concrete is affected by factors such as temperature, humidity, and the type of cement used.
Q3. Least count of staff reading
The least count of staff reading is the smallest measurement that can be read and recorded using the staff.
The least count is determined by the smallest division on the staff scale.
It is usually expressed in millimeters or centimeters.
For example, if the smallest division on the staff scale is 1 mm, then the least count is 1 mm.
The least count is important in accurately measuring and recording distances in civil engineering projects.
Q4. Bottom width of the dam
Bottom width of the dam is the width of the base of the dam at its lowest point.
Bottom width is an important factor in determining the stability of the dam.
It is usually wider than the top width to provide a stable foundation.
The width varies depending on the height and type of dam.
For example, a concrete gravity dam may have a bottom width of 1/4 to 1/3 of its height.
A rockfill dam may have a bottom width of 1/2 to 2/3 of its height.
Q5. Bund height of my previous job
The bund height of my previous job was 3 meters.
The bund height refers to the height of an embankment or barrier constructed to contain or control the flow of liquids, such as water or chemicals.
In my previous job, I was responsible for designing and constructing a bund to contain hazardous materials.
The bund height of 3 meters was determined based on the volume and characteristics of the materials being stored.
I ensured that the bund was constructed according to relevant reg...read more
Q6. What is construction management
Construction management involves planning, coordinating, and overseeing construction projects from start to finish.
Involves coordinating with architects, engineers, contractors, and other stakeholders
Includes scheduling, budgeting, quality control, and safety management
Responsible for ensuring projects are completed on time and within budget
Examples: creating project timelines, managing subcontractors, resolving construction issues
Top HR Questions asked in Kellogg Brown and Root
Interview Process at Kellogg Brown and Root
Top Civil Engineer Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month