Filter interviews by
Improvements done to reduce MTBF
MTTR tracking involves monitoring and analyzing the time taken to repair issues and implementing strategies to reduce it.
Implement a system to track MTTR for each incident or issue
Analyze the data to identify common causes of delays in resolution
Implement process improvements to streamline the resolution process
Provide training to team members to enhance their skills and efficiency
Regularly review and adjust strategies
Top trending discussions
posted on 12 Mar 2024
Project safety refers to the measures and protocols put in place to ensure the well-being and protection of individuals involved in a project.
Ensures the physical and mental well-being of workers and stakeholders
Reduces the risk of accidents, injuries, and fatalities
Compliance with safety regulations and standards
Enhances productivity and efficiency by minimizing disruptions
Builds trust and reputation with clients and ...
Project scheduling is the process of creating a timeline for completing tasks and milestones within a project.
Identifying project tasks and their dependencies
Estimating the time required for each task
Sequencing tasks in the most efficient order
Assigning resources to tasks
Monitoring progress and adjusting the schedule as needed
In a fire case situation at a project, it is crucial to follow safety protocols and evacuate all personnel immediately.
Ensure all personnel are aware of the emergency procedures and evacuation routes.
Contact emergency services and alert them of the situation.
Use fire extinguishers if safe to do so, but prioritize safety of personnel.
Account for all personnel after evacuation to ensure everyone is safe.
Investigate the c...
I have used project management tools such as Jira, Trello, and Asana in previous projects.
Jira
Trello
Asana
I have experience using CAD tools such as AutoCAD, SolidWorks, and CATIA for designing and modeling.
AutoCAD
SolidWorks
CATIA
posted on 26 Apr 2024
I applied via Walk-in
Mixed design is a research design that combines elements of both quantitative and qualitative research methods.
Mixed design involves collecting and analyzing both numerical data and non-numerical data.
It allows researchers to gain a more comprehensive understanding of a research topic by utilizing the strengths of both quantitative and qualitative approaches.
Examples of mixed design studies include using surveys to col...
A cube mould is a device used in construction to create concrete cubes for testing the compressive strength of concrete.
Cube moulds are typically made of steel or cast iron and come in various sizes.
Concrete is poured into the cube mould and allowed to set before being tested for strength.
The dimensions of the cube mould are standardized to ensure accurate testing results.
Cube moulds are commonly used in construction p...
M20 grade is a mix of concrete with a compressive strength of 20 megapascals after 28 days.
M20 grade concrete is commonly used for residential construction.
It is a mix of 1:1.5:3 (cement:sand:aggregate).
The compressive strength of M20 grade concrete is achieved after 28 days of curing.
It is suitable for foundations, slabs, beams, columns, etc.
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
2 c++ coding questions will be asked based on the STL and array operations
posted on 16 Mar 2024
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
Basic terms of construction refer to fundamental concepts and terminology used in the construction industry.
Foundation: The base on which a building or structure is constructed.
Structural elements: Beams, columns, and walls that support the building.
Materials: The substances used in construction, such as concrete, steel, and wood.
Blueprints: Detailed plans and drawings that guide the construction process.
Permits: Legal...
To estimate the raft foundation for 35m×75m within 14 days, consider factors like soil type, load bearing capacity, labor availability, equipment needed, and weather conditions.
Assess soil type to determine necessary excavation and compaction methods
Calculate load bearing capacity based on structure weight and soil properties
Consider availability of skilled labor and equipment for construction
Factor in weather conditio...
Concrete technology involves the study of materials used in construction, their properties, and how they interact to form a strong and durable material.
Concrete is a composite material made up of cement, water, aggregates (such as sand or gravel), and sometimes additives.
The properties of concrete can be influenced by the ratio of these components, the curing process, and the use of admixtures.
Some important properties...
What's your profile and project
Interview experience
Project Manager
7
salaries
| ₹24 L/yr - ₹50 L/yr |
Relationship Manager
7
salaries
| ₹2.5 L/yr - ₹3.8 L/yr |
Relationship Officer
7
salaries
| ₹1.7 L/yr - ₹2.5 L/yr |
Sales Executive
7
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Assistant Manager
5
salaries
| ₹3.5 L/yr - ₹9.8 L/yr |
AIRBUS
Thales
Tata Lockheed Martin Aerostructures
Northrop Grumman