Filter interviews by
posted on 19 Dec 2020
I applied via Referral and was interviewed before Dec 2019. There were 3 interview rounds.
The stages of press tool development for a part involve designing, prototyping, testing, and refining the tool.
Designing the press tool based on the part's specifications
Prototyping the tool to ensure it works as intended
Testing the tool with the part to identify any issues
Refining the tool based on testing results and making necessary adjustments
APQP, PPAP, MSA, SPC are quality control tools used in manufacturing.
APQP (Advanced Product Quality Planning) is a framework used to plan and develop new products or processes.
PPAP (Production Part Approval Process) is a set of procedures used to ensure that manufactured parts meet customer requirements.
MSA (Measurement System Analysis) is a statistical tool used to assess the accuracy and precision of measurement syst...
Press tools are used to cut, shape, and form materials. Different types of materials are used in press tools.
Common materials used in press tools include steel, aluminum, and copper alloys.
The choice of material depends on the application and the desired properties of the finished product.
Hardened tool steels are often used for cutting and shaping operations, while softer materials may be used for forming.
Coatings and ...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
posted on 20 Feb 2021
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
posted on 22 Aug 2021
I applied via Recruitment Consultant and was interviewed in Feb 2021. There was 1 interview round.
IVR application can be deployed in servers using various deployment methods.
Choose a deployment method based on the application requirements and server environment.
Common deployment methods include manual deployment, automated deployment, and containerization.
Ensure that all necessary dependencies and configurations are included in the deployment package.
Test the application thoroughly after deployment to ensure it is
posted on 24 Mar 2021
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
based on 1 review
Rating in categories
QA Engineer
4
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Assistant Manager - Production
4
salaries
| ₹5.5 L/yr - ₹5.5 L/yr |
Assistant Manager- HR
3
salaries
| ₹4.2 L/yr - ₹4.2 L/yr |