I applied via Campus Placement and was interviewed in Aug 2021. There were 4 interview rounds.
Top trending discussions
I applied via campus placement at National Institute of Technology, Surathkal and was interviewed in Oct 2023. There were 4 interview rounds.
Questions related to personal and some managerial questions and aptitude and also subject related questions
I applied via Approached by Company and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Campus Placement
I applied via campus placement at Dayalbagh Educational Institute, Agra and was interviewed before Apr 2021. There were 4 interview rounds.
IQ..reasoning..logic based
posted on 10 Aug 2020
I applied via Campus Placement and was interviewed in Mar 2020. There were 4 interview rounds.
posted on 8 May 2022
I applied via Campus Placement and was interviewed before May 2021. There were 2 interview rounds.
Basic aptitude questions
posted on 18 Sep 2015
posted on 20 Oct 2021
I applied via Walk-in and was interviewed in Sep 2021. There were 4 interview rounds.
Materials used for Glass include silica, soda ash, limestone, and recycled glass.
Silica is the main ingredient in glass production
Soda ash is used to lower the melting point of silica
Limestone is added to improve the durability of glass
Recycled glass can be used to make new glass products
Materials for moulds
Common materials for moulds include steel, aluminum, and plastic
The choice of material depends on factors such as the type of product being moulded, the expected production volume, and the desired surface finish
Steel is often used for high-volume production of complex parts, while aluminum is preferred for low-volume production and prototypes
Plastic moulds are suitable for simple shapes and low-volu...
My major project in Btech was on the development of a smart irrigation system.
The project aimed to optimize water usage in agriculture by using IoT sensors and machine learning algorithms.
We developed a prototype system that could monitor soil moisture levels, weather conditions, and crop water requirements.
The system could then automatically adjust irrigation schedules and water flow rates to ensure optimal crop growt...
Production Engineer
168
salaries
| ₹2.1 L/yr - ₹6.5 L/yr |
Junior Engineer
161
salaries
| ₹1.9 L/yr - ₹4.7 L/yr |
Assistant Manager
82
salaries
| ₹3.8 L/yr - ₹12 L/yr |
Engineer
74
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Technical Supervisor
67
salaries
| ₹1.6 L/yr - ₹3.4 L/yr |
Uflex
EPL Limited
Huhtamaki
Cosmo Films