Filter interviews by
I was interviewed before Jan 2024.
Top trending discussions
I applied via Campus Placement and was interviewed in Oct 2024. There were 2 interview rounds.
Normal test for releted filed of position
posted on 23 Sep 2022
Discussed on Denomination topic
posted on 10 Mar 2020
I applied via Recruitment Consulltant and was interviewed before Mar 2019. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2024. There were 2 interview rounds.
Normal test for releted filed of position
posted on 23 Sep 2022
Discussed on Denomination topic
posted on 10 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There were 2 interview rounds.
To reduce rejection in powder coating, proper surface preparation, correct powder application, and regular equipment maintenance are essential.
Ensure proper surface preparation by cleaning and degreasing the substrate before coating.
Use the correct powder application techniques such as proper gun settings and consistent film thickness.
Regularly maintain and calibrate equipment to ensure uniform coating and prevent defe...
posted on 10 Mar 2020
I applied via Recruitment Consulltant and was interviewed before Mar 2019. There were 3 interview rounds.
Interview experience
based on 8 reviews
Rating in categories
Assistant Manager
58
salaries
| ₹6 L/yr - ₹12 L/yr |
Design Engineer
52
salaries
| ₹3 L/yr - ₹6.2 L/yr |
Junior Engineer
45
salaries
| ₹2.8 L/yr - ₹4.2 L/yr |
Deputy Manager
42
salaries
| ₹9 L/yr - ₹16.5 L/yr |
Manager
21
salaries
| ₹8.6 L/yr - ₹16.3 L/yr |
JCB
Tata Hitachi Construction Machinery
Komatsu
Caterpillar Inc