There are two main types of engines: internal combustion engines and external combustion engines. Parameters to check include fuel efficiency, emissions, power output, and overall performance.
Internal combustion engines: gasoline engines, diesel engines
External combustion engines: steam engines
Parameters to check: fuel efficiency, emissions, power output, performance
Root cost is the initial cost of a product, TPM is Total Productive Maintenance, Poka Yoke is error-proofing technique, 7 QC tools are quality control tools, and change management is the process of managing changes effectively.
Root cost is the initial cost incurred in producing a product before any additional costs are added.
TPM focuses on maximizing the effectiveness of equipment maintenance to ensure optimal producti...
Top trending discussions
I was interviewed in Dec 2024.
Jobs can be either on role (permanent) or off role (temporary/contractual)
On role jobs are permanent positions within the company
Off role jobs are temporary or contractual positions
On role employees receive benefits like insurance, paid leave, etc.
Off role employees may not receive the same benefits as on role employees
Example: Production Engineer can be hired on role as a permanent employee or off role for a specific
The salary for a Production Engineer with 3 years of experience can vary depending on location, company size, and industry.
Salaries for Production Engineers with 3 years of experience typically range from $60,000 to $90,000 per year.
Factors such as location (urban vs rural), company size, and industry (tech, manufacturing, etc.) can impact salary levels.
Additional certifications or specialized skills can also lead to h...
posted on 25 Jan 2025
I was interviewed in Dec 2024.
I applied via Campus Placement and was interviewed in Mar 2024. There were 3 interview rounds.
posted on 12 Feb 2024
I applied via Approached by Company
Troubleshooting involves identifying, analyzing, and solving problems in a systematic manner.
Identify the problem by gathering information and observing the issue
Analyze the possible causes of the problem using logical reasoning and data
Develop a plan to address the root cause of the issue
Implement the solution and test to ensure it resolves the problem
Document the troubleshooting process for future reference
A fishbone diagram, also known as Ishikawa diagram, is a visual tool used to analyze potential causes of a problem.
Also known as Ishikawa diagram
Used to analyze potential causes of a problem
Categories typically include people, process, environment, equipment, and materials
Cycle time is the total time taken to complete a process, while takt time is the time available to complete a process.
Cycle time includes both processing time and any wait time in between tasks
Takt time is calculated as available production time divided by customer demand
For example, if a production line has a cycle time of 10 minutes and a takt time of 5 minutes, it means the line can produce 2 units every 10 minutes
I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.
Car manufacturing, and production
based on 3 interviews
Interview experience
based on 15 reviews
Rating in categories
Deputy Manager
117
salaries
| ₹7.2 L/yr - ₹16.8 L/yr |
Diploma Trainee Engineer
104
salaries
| ₹1.1 L/yr - ₹3 L/yr |
Assistant Manager
99
salaries
| ₹4.8 L/yr - ₹10.2 L/yr |
Production Supervisor
43
salaries
| ₹1.2 L/yr - ₹5.1 L/yr |
Production Engineer
38
salaries
| ₹1.4 L/yr - ₹4 L/yr |
Tractors and Farm Equipment
Sonalika Tractors
John Deere
New Holland Fiat (India)