Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Mahindra Lifespace Developers Site Incharge Interview Questions and Answers

Updated 26 Sep 2023

Mahindra Lifespace Developers Site Incharge Interview Experiences

1 interview found

Site Incharge Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2023

Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(4 Questions)

  • Q1. How many types of earthing ?? Ans. There are mainly three types of earthing.
  • Q2. What is the full form of OCB? Ans. The full form of OCB is Oil Circuit Breaker.
  • Ans. 

    OCB stands for Oil Circuit Breaker, a type of circuit breaker that uses oil as the medium for arc extinction.

    • OCB is commonly used in high voltage applications.

    • The oil in OCB helps to extinguish the arc that forms when the circuit breaker interrupts the current flow.

    • OCBs are known for their reliability and ability to handle high current interruptions.

    • Example: A transformer substation may use OCBs for circuit protection.

  • Answered by AI
  • Q3. What is the full form of APFC Panel? Ans. The Full form of APFC is automatic power factor capacitor panel.
  • Ans. 

    APFC Panel stands for Automatic Power Factor Capacitor Panel.

    • APFC Panel is used to improve power factor in electrical systems.

    • It automatically switches capacitors in and out of the circuit to maintain a desired power factor.

    • Helps in reducing electricity bills by avoiding penalties for low power factor.

    • Example: APFC Panel is commonly used in industries and commercial buildings.

    • It helps in optimizing energy usage and red

  • Answered by AI
  • Q4. On what principle does the transformer work? Ans. Transformer works on the principle of mutual induction.

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your work honestly.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What the sampling frequency for private density test in per square meter?
  • Ans. 

    The sampling frequency for private density test per square meter depends on the type of test being conducted.

    • The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.

    • For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Alu-from
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects.
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Proper channel. Naukri. Hr mail.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to QA/QC and IS standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong base required to crack return test
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Start to handover process in a Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be well prepared in terms of all types of processes and sequences in construction. Situation based problem solving abilities and good communication skills.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Tell me about yourself?
  • Q2. Past experience and academic
  • Q3. Software related-AutoCAD and Revit
  • Q4. What is Copy Monitor?
  • Ans. 

    Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.

    • It allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.

    • It can also be used to monitor changes to parame...

  • Answered by AI
  • Q5. How do you link Revit models?
  • Ans. 

    Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.

    • Open the host model and go to the 'Insert' tab.

    • Click on 'Link Revit' and select the model to be linked.

    • Choose the appropriate settings for the link, such as positioning and visibility.

    • Repeat the process for any additional models to be linked.

    • Save the host model to ensure the links are maintained.

  • Answered by AI
Round 3 - Assignment 

They gave an architectural model to create a structural model

Round 4 - HR 

(3 Questions)

  • Q1. Why are you changing the company?
  • Q2. What is your expectation?
  • Q3. Will you work for the same salary which you are getting for previous company?

Interview Preparation Tips

Topics to prepare for Sobha Senior Engineer interview:
  • software knowledge
  • REVIT Structure
  • AutoCAD
Interview preparation tips for other job seekers - it is like a government job.. if you like gossips and all you have to consider this company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Finishing activities
  • Q2. Types of paints, tiles.
  • Ans. 

    Types of paints and tiles commonly used in construction projects.

    • Types of paints: acrylic, latex, oil-based, enamel, spray paint

    • Types of tiles: ceramic, porcelain, glass, natural stone, mosaic

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions will be asked based on your past experience.
Contribute & help others!
anonymous
You can choose to be anonymous

Mahindra Lifespace Developers Interview FAQs

How many rounds are there in Mahindra Lifespace Developers Site Incharge interview?
Mahindra Lifespace Developers interview process usually has 2 rounds. The most common rounds in the Mahindra Lifespace Developers interview process are Resume Shortlist and HR.
What are the top questions asked in Mahindra Lifespace Developers Site Incharge interview?

Some of the top questions asked at the Mahindra Lifespace Developers Site Incharge interview -

  1. What is the full form of APFC Panel? Ans. The Full form of APFC is automatic po...read more
  2. What is the full form of OCB? Ans. The full form of OCB is Oil Circuit Break...read more
  3. On what principle does the transformer work? Ans. Transformer works on the prin...read more

Recently Viewed

INTERVIEWS

Crest Infosystems

No Interviews

INTERVIEWS

Brane Enterprises

No Interviews

INTERVIEWS

Tata AutoComp Systems

No Interviews

INTERVIEWS

Mahindra Lifespace Developers

No Interviews

INTERVIEWS

Axis Bank

No Interviews

LIST OF COMPANIES

Mahindra Lifespace Developers

Locations

INTERVIEWS

Celebal Technologies

No Interviews

LIST OF COMPANIES

BlueBinaries Engineering and Solutions

Overview

INTERVIEWS

Steel Strips Wheels

No Interviews

INTERVIEWS

Qualcomm

10 top interview questions

Tell us how to improve this page.

Mahindra Lifespace Developers Site Incharge Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 128 Interviews
DLF Interview Questions
3.9
 • 75 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Omaxe Interview Questions
4.1
 • 35 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Sunteck Realty Interview Questions
3.3
 • 23 Interviews
View all
Assistant Manager
147 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
60 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
26 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Mahindra Lifespace Developers with

Godrej Properties

3.7
Compare

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent