Filter interviews by
I applied via Job Portal and was interviewed in Jun 2024. There was 1 interview round.
The combustion chamber is where fuel and air are mixed and burned in an internal combustion engine.
It is a part of an internal combustion engine where the fuel-air mixture is ignited and burned.
The combustion chamber is designed to contain and control the combustion process.
It is typically located within the cylinder head of an engine.
The shape and design of the combustion chamber can affect engine performance and effi
Refrigerant system is a closed loop system that absorbs heat from a low-temperature area and releases it in a high-temperature area.
Refrigerant circulates through the system to absorb and release heat
Compressor increases the pressure of the refrigerant gas
Condenser cools the refrigerant gas into a liquid
Expansion valve reduces the pressure of the liquid refrigerant
Evaporator absorbs heat from the surrounding area to co...
Top trending discussions
I applied via Job Fair and was interviewed before Mar 2021. There were 4 interview rounds.
Topic for discussion
My strengths include problem-solving, attention to detail, and strong technical skills. My weaknesses include being overly critical of my own work and sometimes struggling with delegation.
Strength: Problem-solving - I enjoy analyzing complex problems and finding efficient solutions.
Strength: Attention to detail - I have a meticulous approach to my work, ensuring accuracy and quality.
Strength: Strong technical skills - ...
I applied via Campus Placement and was interviewed before Mar 2021. There were 3 interview rounds.
I have a strong background in production engineering and a proven track record of improving efficiency and reducing costs.
I have a Bachelor's degree in Production Engineering and have completed internships at two leading manufacturing companies.
I have successfully implemented process improvements that resulted in a 20% increase in production output at my previous job.
I am skilled in using various production software an...
I applied via Job Fair and was interviewed before Mar 2021. There were 2 interview rounds.
I am graduation in Mechanical Engineering and also done my diploma mechanical automobile in ghaziabad
I applied via Job Fair and was interviewed before Mar 2021. There were 2 interview rounds.
I am graduation in Mechanical Engineering and also done my diploma mechanical automobile in ghaziabad
I applied via Recruitment Consultant and was interviewed in Dec 2020. There was 1 interview round.
Productivity in business refers to the efficiency and effectiveness of the production process.
Productivity is the measure of output per unit of input.
It is important for businesses to maximize productivity to increase profits and remain competitive.
Factors that can affect productivity include technology, employee training, and management practices.
Examples of productivity measures include units produced per hour, reven...
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
Explanation of how to calculate OEE, use 7QC tools, TMP, productivity, team building, manpower management, SAP module, inventory control, and scrap reduction.
OEE calculation involves multiplying availability, performance, and quality percentages
7QC tools include Pareto chart, fishbone diagram, control chart, etc.
TMP stands for Total Maintenance Productivity and measures maintenance efficiency
Productivity can be calcula...
I applied via Naukri.com and was interviewed in Oct 2022. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 2 interview rounds.
The list count of vernier caliper is 20.
Vernier caliper has two scales - main scale and vernier scale.
The main scale has 10 divisions, each division is 1 mm.
The vernier scale has 9 divisions, each division is 0.9 mm.
The list count is the number of smallest divisions on the vernier scale that coincide with a division on the main scale.
In case of vernier caliper, the list count is 20.
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. 5M is a method for improving workplace safety and efficiency. KPI stands for Key Performance Indicator.
5S focuses on organizing the workplace to improve efficiency and reduce waste.
5M stands for Man, Machine, Material, Method, and Measurement and is used to identify areas for improvement in workp...
based on 1 interview
Interview experience
based on 14 reviews
Rating in categories
Senior Design Engineer
150
salaries
| ₹4.8 L/yr - ₹18 L/yr |
Design Engineer
141
salaries
| ₹2.4 L/yr - ₹11.5 L/yr |
Lead Engineer
133
salaries
| ₹7.8 L/yr - ₹21.6 L/yr |
Software Engineer
115
salaries
| ₹4.4 L/yr - ₹12.8 L/yr |
Engineer
104
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Bosch
Yazaki
Faurecia
Valeo