Filter interviews by
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.
Top trending discussions
I applied via Campus Placement and was interviewed before Dec 2020. There was 1 interview round.
Process Control
Process control is my favorite subject in chemical engineering.
I enjoy studying the principles and techniques used to control and optimize chemical processes.
I find it fascinating how process control systems can improve efficiency, safety, and product quality.
One example of process control is the use of feedback loops to maintain desired operating conditions in a chemical reactor.
I also appreciate the im...
Thermodynamics is the study of energy and its transformations in various forms of matter.
Thermodynamics is used in the design and optimization of engines, power plants, refrigeration systems, and other devices that involve energy transfer.
It is also used in the study of chemical reactions and the behavior of materials at high temperatures and pressures.
Thermodynamics helps in understanding the properties of materials a...
I applied via Approached by Company and was interviewed before Jun 2021. There was 1 interview round.
posted on 17 Mar 2022
Heat transfer types include conduction, convection, and radiation. Kettle type reboiler is a type of heat exchanger used in distillation processes. ISO systems are international standards for quality management.
Conduction transfers heat through a material without any movement of the material itself
Convection transfers heat through the movement of fluids or gases
Radiation transfers heat through electromagnetic waves
Kett...
posted on 11 Apr 2024
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
posted on 30 Jul 2024
It was very nice experience
My current CTC is confidential and I would prefer not to disclose it.
I am not comfortable sharing my current CTC as it is confidential information.
I believe that discussing salary details should be done at a later stage in the interview process.
I am more interested in discussing the responsibilities and opportunities of the role.
I applied via Referral and was interviewed before Jul 2019. There was 1 interview round.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
based on 4 reviews
Rating in categories
Junior Engineer
35
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Production Engineer
29
salaries
| ₹2.7 L/yr - ₹5.6 L/yr |
Assistant Manager
24
salaries
| ₹6 L/yr - ₹10 L/yr |
Senior Executive
24
salaries
| ₹4.5 L/yr - ₹7 L/yr |
Engineer
14
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
Nayara Energy
Supreme Industries
HPCL-Mittal Energy Limited
Ongc Petro Additions