Upload Button Icon Add office photos

Filter interviews by

M.G.POLYBLENDS Production Planning Manager Interview Questions and Answers

Updated 12 Aug 2022

M.G.POLYBLENDS Production Planning Manager Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Calculation on tips (%)

Interview Preparation Tips

Interview preparation tips for other job seekers - Not required and study for this jobs . only calculation

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Technical 

(2 Questions)

  • Q1. Questions on computer networks
  • Q2. Questions on SQL queries and DSA
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Technical Aptitude test

Round 2 - Coding Test 

Data Structures and Algorithms

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. TELL ME ABOUT YOURSELF & HOW YOU WILL BE AN ASSET FOR OUR ORGANIZATION
Round 3 - Technical 

(1 Question)

  • Q1. EXPLAIN WIRE DRAWING PROCESS PARAMETERS
  • Ans. 

    Wire drawing process parameters involve factors like die angle, reduction ratio, lubrication, and speed.

    • Die angle affects the shape and size of the wire being drawn.

    • Reduction ratio determines the amount of diameter reduction in each pass.

    • Lubrication is crucial for reducing friction and heat during the process.

    • Speed influences the overall efficiency and quality of the drawn wire.

  • Answered by AI
Round 4 - One-on-one 

(2 Questions)

  • Q1. HOW YOU WILL CONTROL COST
  • Ans. 

    By implementing cost control measures, monitoring expenses, negotiating with suppliers, and optimizing production processes.

    • Implementing cost control measures such as setting budgets and tracking expenses

    • Monitoring expenses regularly to identify areas of overspending

    • Negotiating with suppliers to get the best prices for materials and services

    • Optimizing production processes to reduce waste and improve efficiency

  • Answered by AI
  • Q2. WHERE YOU SEE YOURSELF AFTER 5 YEARS.

Interview Preparation Tips

Topics to prepare for Patil Group Production Manager interview:
  • 5s
  • TPM
  • Pareto Analysis
Interview preparation tips for other job seekers - Be honest during the interviews. It will gives you a next level of confidence.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic to be strong
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Government College of Engineering, Aurangabad and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Questions on outputs of c code, microprocessor, dbms queries

Round 2 - Coding Test 

Easy to medium level 5 questions were asked

Round 3 - Technical 

(1 Question)

  • Q1. Project discussion, dbms normalisation, 2 3 dsa questions

M.G.POLYBLENDS Interview FAQs

How many rounds are there in M.G.POLYBLENDS Production Planning Manager interview?
M.G.POLYBLENDS interview process usually has 2 rounds. The most common rounds in the M.G.POLYBLENDS interview process are Resume Shortlist and One-on-one Round.

Tell us how to improve this page.

Interview Questions from Similar Companies

Grasim Industries Interview Questions
4.0
 • 205 Interviews
Deltax Interview Questions
2.8
 • 85 Interviews
GAIL Interview Questions
4.4
 • 78 Interviews
ExxonMobil Interview Questions
3.8
 • 68 Interviews
Tata Chemicals Interview Questions
4.1
 • 59 Interviews
Wayfair Interview Questions
3.7
 • 56 Interviews
View all

M.G.POLYBLENDS Production Planning Manager Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

1.0

Work-life balance

1.0

Salary

1.0

Job security

1.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Senior Production Engineer
5 salaries
unlock blur

₹3.5 L/yr - ₹4.8 L/yr

Production Engineer
4 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Store Incharge
3 salaries
unlock blur

₹4.2 L/yr - ₹4.2 L/yr

International Sales Manager
3 salaries
unlock blur

₹9.5 L/yr - ₹11 L/yr

Explore more salaries
Compare M.G.POLYBLENDS with

Reliance Industries

4.0
Compare

Grasim Industries

4.0
Compare

Tata Chemicals

4.1
Compare

Haldia Petrochemicals

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview