i
Lumax Industries
Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Sep 2021. There was 1 interview round.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 3 interview rounds.
Yes
Yes, I have audited suppliers and conducted vendor visits.
During my previous role as a Senior Engineer, I was responsible for auditing suppliers to ensure compliance with quality standards and specifications.
I have also conducted vendor visits to assess their capabilities, production processes, and quality control measures.
These audits and visits helped in identifying potential risks, improving supplier performance,...
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
I appeared for an interview before Mar 2024, where I was asked the following questions.
I appeared for an interview before Mar 2024.
Past experience based questions
Approach in chiller refers to the method or strategy used to control the temperature of the chilled water.
Approach in chiller is the temperature difference between the leaving chilled water and the entering chilled water.
A smaller approach indicates better chiller performance.
Approach can be controlled by adjusting the flow rate of the chilled water or the setpoint of the chiller.
Monitoring approach is important to ens
Factors affecting cooling tower efficiency include water quality, air flow, temperature differentials, and fouling.
Water quality - Impurities in water can reduce heat transfer efficiency.
Air flow - Proper air flow is essential for heat exchange.
Temperature differentials - Larger differentials between hot and cold water improve efficiency.
Fouling - Buildup of scale or debris can decrease efficiency.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
based on 25 reviews
Rating in categories
Assistant Engineer
385
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Assistant Manager
334
salaries
| ₹4.6 L/yr - ₹12.5 L/yr |
Engineer
313
salaries
| ₹2 L/yr - ₹5.7 L/yr |
Senior Engineer
221
salaries
| ₹3.4 L/yr - ₹9 L/yr |
Deputy Manager
163
salaries
| ₹6 L/yr - ₹17 L/yr |
Ceat Tyres
UNO Minda
Apollo Tyres
Exide Industries