Regarding electrical project related discussion
I appeared for an interview before Feb 2024.
AC-DC converter converts alternating current (AC) to direct current (DC) for various applications.
AC voltage is converted to DC voltage using rectifiers
Rectifiers can be half-wave, full-wave, or bridge rectifiers
Filtering is done to smooth out the output voltage
Examples include power supplies for electronic devices and battery chargers
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 5 Aug 2024
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
I chose Electrical Engineering because of my passion for understanding and working with technology.
Fascination with technology and how things work
Interest in problem-solving and innovation
Desire to contribute to advancements in the field
Enjoyment of hands-on projects and experimentation
posted on 24 Nov 2021
I applied via Naukri.com and was interviewed before Nov 2020. There was 1 interview round.
posted on 9 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Gravels are used in switch yards to provide a stable surface for equipment and to improve drainage.
Gravels help in reducing the risk of equipment damage due to flooding or standing water.
They also help in preventing erosion and maintaining the stability of the ground.
Gravels are easy to install and maintain, making them a cost-effective option for switch yards.
They allow for better heat dissipation, which is important ...
A Single Line Diagram (SLD) of a 33/11 kV switchyard shows the layout and connections of electrical equipment.
Key equipments include transformers, circuit breakers, isolators, busbars, surge arresters, and control panels.
Transformers step down voltage from 33 kV to 11 kV for distribution.
Circuit breakers protect the system from overloads and short circuits.
Isolators are used for isolating equipment for maintenance.
Busb...
OC and SC tests are conducted on transformers to determine their efficiency and performance under different load conditions.
OC test (Open Circuit test) is conducted to determine the no-load loss and magnetizing impedance of the transformer.
SC test (Short Circuit test) is conducted to determine the full-load copper loss and equivalent resistance of the transformer.
Both tests help in evaluating the efficiency and voltage...
posted on 31 Oct 2022
based on 5 reviews
Rating in categories
Production Engineer
30
salaries
| ₹1.5 L/yr - ₹5.2 L/yr |
Senior Design Engineer
29
salaries
| ₹6.3 L/yr - ₹15 L/yr |
Test Engineer
25
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Assistant Manager
23
salaries
| ₹8.6 L/yr - ₹15 L/yr |
Senior Executive
18
salaries
| ₹5.6 L/yr - ₹13 L/yr |
Amphenol Interconnect
East India Udyog
SasMos HET Technologies
Bekaert Industries