Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Logicon Facility Management Team. If you also belong to the team, you can get access from here

Logicon Facility Management Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Logicon Facility Management Mst Electrician Interview Questions and Answers

Updated 8 Aug 2022

Logicon Facility Management Mst Electrician Interview Experiences

1 interview found

Round 1 - Technical 

(2 Questions)

  • Q1. Any questions DG HT panel lt panel
  • Q2. HT high tensions lt low tension

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge need a job I have a good need a good knowledge

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. One on one round . electrician work .all electrical work .

Interview Preparation Tips

Interview preparation tips for other job seekers - Lt Ht VCB ACB handling.Dg operating .stater panal check.Dol stater and star delta starer check ..moter check.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 4 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Ups work maintenance
  • Q2. Transformer work
  • Ans. 

    Transformer work involves installing, maintaining, and repairing electrical transformers.

    • Installing new transformers in buildings or industrial sites

    • Performing routine maintenance on transformers to ensure they are functioning properly

    • Repairing faulty transformers to restore functionality

    • Testing transformers to ensure they are operating within specifications

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. All transformer part
  • Ans. 

    Transformer parts include core, windings, insulation, and terminals.

    • Core: Provides magnetic path for the transformer

    • Windings: Conductors that carry current and create magnetic field

    • Insulation: Prevents short circuits between windings

    • Terminals: Connect transformer to external circuit

    • Examples: Enameled copper wire for windings, silicon steel for core

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What is timing joining
  • Ans. 

    Timing joining refers to the process of connecting electrical wires or components based on a specific timing sequence.

    • Timing joining involves connecting electrical components in a specific order to ensure proper functioning.

    • It is crucial in complex electrical systems where timing is essential for synchronization.

    • Examples include connecting wires in a circuit board based on a predetermined timing sequence.

    • It can also re...

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. Generator operatare

Interview Preparation Tips

Interview preparation tips for other job seekers - All question is good technical question.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(1 Question)

  • Q1. Why are you leaving your current job
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Reality to my Electrician job
  • Q2. 10 question paper also given and we have to solve
Round 3 - Group Discussion 

Reality to my Electrician job and my family details

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing all company doing same
But question is like higher than your education
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Basic question about your profession & about your experience in your field
  • Q2. Basic knowledge about your work

Interview Preparation Tips

Topics to prepare for Efs Facilities Services Hvac Technician interview:
  • Basic knowledge in your professi
Interview preparation tips for other job seekers - Before joining this company check out your salary ctc and job security

I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical quetions Department subjects Electrical points Electrical thieories
  • Q2. Basic formulaws Basic knoledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Good skill of their subjects and good communication in english and region al language
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. They only concentration on transformer and pannel board wiring
  • Ans. Transformer parts and panel board wiring
  • Answered Anonymously
  • Q2. Transformer and parts

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't go the company in chennai they for technician because they are all except more knowledge apart from the studies and they will not selected by working electrician they expect more knowledge like Thomas alwa Edison they have to select only recommended and known persons only so please don't waste your time and money
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is the fullform of the AHU
  • Ans. 

    AHU stands for Air Handling Unit.

    • AHU is a device used to regulate and circulate air as part of a heating, ventilation, and air conditioning (HVAC) system.

    • It typically consists of a blower, heating or cooling elements, filters, dampers, and sound attenuators.

    • AHUs are commonly found in commercial and industrial buildings to maintain indoor air quality and comfort.

    • Examples of AHU manufacturers include Trane, Carrier, and

  • Answered by AI
  • Q2. Fullform of the AHU Air Handling unit
  • Ans. 

    Air Handling Unit

    • AHU stands for Air Handling Unit

    • AHUs are used to regulate and circulate air as part of HVAC systems

    • They typically consist of a blower, heating or cooling elements, filters, and dampers

    • AHUs are commonly found in commercial and industrial buildings

  • Answered by AI
  • Q3. Who many years of experience
  • Q4. I work realated 2 years

Interview Questionnaire 

1 Question

  • Q1. What's BTU METER
  • Ans. 

    BTU meter is a device used to measure the heat energy in a fluid flow.

    • BTU stands for British Thermal Unit

    • It measures the amount of heat energy transferred from one medium to another

    • It is commonly used in HVAC systems to measure the heating or cooling output

    • It consists of a flow sensor and temperature sensors to calculate the heat energy

    • Examples of applications include measuring the energy consumption of a building's he

  • Answered by AI

Logicon Facility Management Interview FAQs

How many rounds are there in Logicon Facility Management Mst Electrician interview?
Logicon Facility Management interview process usually has 1 rounds. The most common rounds in the Logicon Facility Management interview process are Technical.
What are the top questions asked in Logicon Facility Management Mst Electrician interview?

Some of the top questions asked at the Logicon Facility Management Mst Electrician interview -

  1. Any questions DG HT panel lt pa...read more
  2. HT high tensions lt low tens...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Leadec India Interview Questions
4.0
 • 72 Interviews
BVG India Interview Questions
3.9
 • 48 Interviews
OCS Group Interview Questions
4.0
 • 42 Interviews
Recpdcl.ltd Interview Questions
4.0
 • 17 Interviews
Sila Solutions Interview Questions
3.9
 • 13 Interviews
View all
Logicon Facility Management Mst Electrician Salary
based on 9 salaries
₹2.4 L/yr - ₹3 L/yr
12% less than the average Mst Electrician Salary in India
View more details

Logicon Facility Management Mst Electrician Reviews and Ratings

based on 3 reviews

3.9/5

Rating in categories

2.9

Skill development

3.0

Work-life balance

2.4

Salary

2.9

Job security

2.9

Company culture

2.4

Promotions

2.9

Work satisfaction

Explore 3 Reviews and Ratings
Technical Supervisor
52 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Electrician
33 salaries
unlock blur

₹1.4 L/yr - ₹2.5 L/yr

Electrical Technician
22 salaries
unlock blur

₹1.5 L/yr - ₹2.5 L/yr

Technician
19 salaries
unlock blur

₹1.3 L/yr - ₹3 L/yr

Shift Engineer
17 salaries
unlock blur

₹2.5 L/yr - ₹3.6 L/yr

Explore more salaries
Compare Logicon Facility Management with

ISS Facility Services

4.1
Compare

Compass Group Support Services

4.0
Compare

BVG India

3.9
Compare

Leadec India

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview