i
Leadec
India
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
DG analysis of a transformer evaluates its performance under different loading conditions and helps in optimizing its operation.
Load Flow Analysis: Evaluates how the transformer performs under various load conditions, ensuring it operates efficiently.
Efficiency Calculation: Determines the efficiency of the transformer at different loads, helping to identify optimal operating points.
Temperature Rise Assessment: Ana...
Single-phase power uses one alternating current, while three-phase power uses three, providing more efficient energy distribution.
Single-Phase Power: Commonly used in residential applications, it consists of one AC waveform, suitable for small loads like lighting and appliances.
Three-Phase Power: Typically used in industrial settings, it consists of three AC waveforms, providing a more constant and efficient power...
Maintaining electrical equipment involves regular inspections, testing, cleaning, and timely repairs to ensure optimal performance and safety.
Regular Inspections: Conduct routine checks to identify wear and tear, such as inspecting circuit breakers and wiring for signs of damage.
Preventive Maintenance: Schedule regular maintenance tasks, like lubricating motors and replacing filters, to prevent unexpected failures...
Gearboxes are mechanical devices that transmit power and control speed and torque in machinery, with various types for specific applications.
1. Manual Gearbox: Requires driver input to change gears, commonly found in cars.
2. Automatic Gearbox: Changes gears automatically based on speed, used in most modern vehicles.
3. CVT (Continuously Variable Transmission): Provides seamless gear changes without distinct shifts,...
PLC (Programmable Logic Controller) is used for industrial automation, while embedded systems are designed for specific tasks in various applications.
PLC is primarily used in industrial environments for automation and control of machinery.
Embedded systems are designed for specific functions within larger systems, like a washing machine's control unit.
PLCs are programmable and can be easily reconfigured for differe...
Transformation ratio is the ratio of the number of turns in the primary winding to the number of turns in the secondary winding of a transformer.
Transformation ratio determines the voltage transformation between the primary and secondary windings of a transformer.
It is calculated as the ratio of the number of turns in the primary winding to the number of turns in the secondary winding.
For example, if a transformer...
The role of APFC (Automatic Power Factor Controller) is to maintain the power factor of electrical systems by automatically switching capacitors in and out of the circuit.
APFC monitors the power factor of the system and activates or deactivates capacitors accordingly.
It helps in reducing electricity bills by improving power factor and reducing reactive power consumption.
APFC ensures efficient utilization of electr...
Delta motor wiring connection circuit diagram involves connecting three phases in a triangular configuration.
Connect the three motor windings in a triangular configuration
Label the three phases as A, B, and C
Connect the end of one winding to the start of the next winding
Ensure proper insulation and secure connections
Use appropriate wire sizes and color codes for easy identification
There are several types of breakers used in electrical engineering.
Circuit breakers are used to protect electrical circuits from overloads and short circuits.
Some common types of breakers include thermal, magnetic, and hydraulic-magnetic breakers.
Thermal breakers use a bimetallic strip to detect excessive heat and trip the circuit.
Magnetic breakers use a solenoid to detect high currents and trip the circuit.
Hydrau...
The number of transformer production varies depending on the company and market demand.
The number of transformer production is influenced by factors such as market demand, company size, and production capacity.
Large transformer manufacturers may produce thousands of transformers per year.
Smaller companies or custom transformer manufacturers may have lower production volumes.
The production volume can also vary base...
Parts of pumps and motors include impeller, casing, shaft, bearings, and seals.
Impeller: Rotating component that generates the flow in a pump.
Casing: Encloses and supports the impeller and other parts of the pump.
Shaft: Transfers power from the motor to the impeller.
Bearings: Support and align the shaft within the pump.
Seals: Prevent leakage of fluid from the pump.
Parts of pumps and motors include impeller, casing, shaft, bearings, and motor housing.
Impeller: Rotating component that generates the flow within the pump.
Casing: Encloses the impeller and directs the flow of fluid through the pump.
Shaft: Transfers the rotational energy from the motor to the impeller.
Bearings: Support the shaft and reduce friction during rotation.
Motor housing: Encloses the motor and provides protecti...
Delta motor wiring connection circuit diagram involves connecting three phases in a triangular configuration.
Connect the three motor windings in a triangular configuration
Label the three phases as A, B, and C
Connect the end of one winding to the start of the next winding
Ensure proper insulation and secure connections
Use appropriate wire sizes and color codes for easy identification
Sensors are devices that detect changes in physical properties and convert them into electrical signals. They come in various types and have specific working conditions.
Types of sensors include temperature sensors, pressure sensors, proximity sensors, motion sensors, etc.
Sensors work by detecting changes in physical properties such as temperature, pressure, light, etc., and converting them into electrical signals.
Worki...
posted on 4 May 2025
I appeared for an interview in Apr 2025, where I was asked the following questions.
Operations and utilities in electrical engineering involve managing systems that generate, transmit, and distribute electrical power.
Power Generation: Involves the production of electricity from various sources such as fossil fuels, nuclear, and renewable energy (e.g., solar, wind).
Transmission Systems: High-voltage lines transport electricity over long distances to minimize losses, ensuring efficient delivery to subst...
Maintaining electrical equipment involves regular inspections, testing, cleaning, and timely repairs to ensure optimal performance and safety.
Regular Inspections: Conduct routine checks to identify wear and tear, such as inspecting circuit breakers and wiring for signs of damage.
Preventive Maintenance: Schedule regular maintenance tasks, like lubricating motors and replacing filters, to prevent unexpected failures.
Test...
I applied via Indeed and was interviewed in Jul 2024. There was 1 interview round.
Flow meters are devices used to measure the flow rate of a fluid in a pipe or conduit.
Differential Pressure Flow Meters (Orifice, Venturi, Pitot Tube)
Velocity Flow Meters (Turbine, Electromagnetic, Ultrasonic)
Positive Displacement Flow Meters (Rotary, Oval Gear, Nutating Disk)
Mass Flow Meters (Coriolis, Thermal, Weighing)
Open Channel Flow Meters (Flume, Weir)
Calibration of control valve involves adjusting the valve to ensure it opens and closes at the correct set points.
Calibration involves adjusting the valve's position to match the desired input signal.
Use calibration tools such as pressure gauges, flow meters, and positioners to adjust the valve.
Perform calibration regularly to ensure the valve operates accurately and efficiently.
Document calibration procedures and resu...
CNC stands for Computer Numerical Control, which is a system that controls the operation of machine tools through programmed commands.
CNC machines are used in various industries such as manufacturing, aerospace, automotive, and healthcare.
Types of CNC machines include CNC milling machines, CNC lathes, CNC routers, and CNC plasma cutters.
CNC machines can be classified based on the number of axes they operate on, such as...
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Currently responsible for overseeing project development activities, ensuring timelines are met and budgets are adhered to.
Leading a team of project coordinators and specialists
Developing project plans and timelines
Monitoring progress and addressing any issues that arise
Collaborating with stakeholders to ensure project goals are met
Managing project budgets and expenses
Seeking new challenges and growth opportunities in a more dynamic work environment.
Looking for new challenges and opportunities for growth
Seeking a more dynamic work environment
Want to expand my skill set and experience
Interested in taking on more responsibilities and leadership roles
I appeared for an interview in Feb 2025, where I was asked the following questions.
PLC (Programmable Logic Controller) is used for industrial automation, while embedded systems are designed for specific tasks in various applications.
PLC is primarily used in industrial environments for automation and control of machinery.
Embedded systems are designed for specific functions within larger systems, like a washing machine's control unit.
PLCs are programmable and can be easily reconfigured for different ta...
I appeared for an interview in Mar 2025, where I was asked the following questions.
My name is kaduba pawar I have meachanical ingineer
Top trending discussions
Some of the top questions asked at the Leadec India interview for experienced candidates -
The duration of Leadec India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 34 interview experiences
Difficulty level
Duration
based on 891 reviews
Rating in categories
Junior Engineer
282
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Engineer
229
salaries
| ₹2.3 L/yr - ₹5.5 L/yr |
Team Lead
194
salaries
| ₹3.9 L/yr - ₹7.1 L/yr |
Senior Technician
187
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Electrical Engineer
153
salaries
| ₹2.3 L/yr - ₹6 L/yr |
Sodexo
Compass Group Support Services
ISS Facility Services
BVG India