Estimate for the raft foundation 35m×75m within 14 days
AnswerBot
6mo
To estimate the raft foundation for 35m×75m within 14 days, consider factors like soil type, load bearing capacity, labor availability, equipment needed, and weather conditions.
Assess soil type to det...read more